{"id":97343,"date":"2013-07-11T13:06:00","date_gmt":"2013-07-11T13:06:00","guid":{"rendered":"https:\/\/bm.dev.synology.me\/?p=97343"},"modified":"2026-04-03T13:48:11","modified_gmt":"2026-04-03T13:48:11","slug":"gazoductul-iasi-ungheni-finalizat-pana-in-decembrie","status":"publish","type":"post","link":"https:\/\/bm.dev.synology.me\/?p=97343","title":{"rendered":"Gazoductul Ia\u015fi-Ungheni, finalizat p\u00e2n\u0103 \u00een decembrie"},"content":{"rendered":"<p>\n&nbsp;&#8220;Interesul nostru pentru interconectarea Republicii Moldova la sistemele noastre de gaze naturale \u015fi energie electric\u0103 este maxim&#8221;, a spus Ni\u0163\u0103, \u00eentr-o conferin\u0163\u0103 de pres\u0103, organizat\u0103 dup\u0103 o \u00eent\u00e2lnire cu o delega\u0163ie din Republica Moldova, condus\u0103 de Valeriu Laz\u0103r, viceprim-ministru \u015fi ministru al Economiei.<\/p>\n<p>\nNi\u0163\u0103 a afirmat c\u0103 gazoductul va putea transporta \u00eentr-o prim\u0103 faz\u0103 500 milioane metri cubi, iar \u00eentr-o etap\u0103 urm\u0103toare va fi construit\u0103 o sta\u0163ie de comprimare. Acest proiect va fi lansat anul viitor, \u00een urma unei investi\u0163ii estimate la 10-20 milioane euro.<\/p>\n<p>\nLaz\u0103r a ar\u0103tat c\u0103 pentru a atinge capacitatea maxim\u0103 va fi nevoie \u015fi de construc\u0163ia unui gazoduct intern suplimentar, care s\u0103 lege Ungheni de Chi\u015fin\u0103u.<\/p>\n<p>\n<a href=\"http:\/\/www.mediafax.ro\/economic\/gazoductul-iasi-ungheni-finalizat-pana-in-decembrie-11116246\">Cititi mai multe pe<\/a> www.mediafax.ro<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construc\u0163ia gazoductului care va lega re\u0163elele din Rom\u00e2nia \u015fi Republica Moldova pe traseul Ia\u015fi-Ungheni va \u00eencepe \u00een august \u015fi va fi \u00eencheiat\u0103 p\u00e2n\u0103 la sf\u00e2r\u015fitul anului, \u00een urma unei investi\u0163ii totale de 23-24 milioane euro, a declarat joi ministrul delegat pentru Energie, Constantin Ni\u0163\u0103.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[510],"tags":[23794,10984,9782,150,9319,12747,8545,274,149,9166,8069,14043,34830],"class_list":["post-97343","post","type-post","status-publish","format-standard","hentry","category-actualitate","tag-august","tag-constructie","tag-declaratii","tag-energie","tag-finalizare","tag-gazoduct","tag-iasi","tag-incepere","tag-investitii","tag-ministru","tag-moldova","tag-republica-moldova","tag-ungheni"],"_links":{"self":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/97343","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=97343"}],"version-history":[{"count":1,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/97343\/revisions"}],"predecessor-version":[{"id":97356,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/97343\/revisions\/97356"}],"wp:attachment":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=97343"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=97343"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=97343"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}