{"id":78093,"date":"2013-02-11T18:11:57","date_gmt":"2013-02-11T18:11:57","guid":{"rendered":"https:\/\/bm.dev.synology.me\/?p=78093"},"modified":"2026-04-03T10:43:15","modified_gmt":"2026-04-03T10:43:15","slug":"11-mld-euro-pentru-90-km-de-cale-ferata-noua-sighisoara-coslariu","status":"publish","type":"post","link":"https:\/\/bm.dev.synology.me\/?p=78093","title":{"rendered":"1,1 mld. euro pentru 90 km de cale ferat\u0103 nou\u0103 Sighi\u015foara &#8211; Co\u015flariu"},"content":{"rendered":"<p>\nMinisterul Transporturilor a semnat vineri cu CFR SA un contract de finan\u0163are \u00een valoare de 4,98 miliarde de lei (1,1 miliarde euro) pentru reabilitarea tronsonului de cale ferat\u0103 Sighi\u015foara-Co\u015flariu (Alba), cu o lungime de 89,5 kilometri. Contractul este cofinan\u0163at de Uniunea European\u0103 cu 740 milioane euro \u015fi prevede reabilitarea a 89,5 kilometri de linie dubl\u0103 electrificat\u0103 de cale ferat\u0103. Ministrul Transporturilor Relu Fenechiu a precizat c\u0103 acesta este cel mai mare contract de finan\u0163are semnat prin Programul Opera\u00ad\u0163ional Sectorial de Transport. El a ad\u0103ugat c\u0103 CFR SA, care admini\u00adstreaz\u0103 infrastructura feroviar\u0103, are semnate prin acest program 18 contracte \u00een valoare de 11,5 miliarde lei. Ministrul a mai spus c\u0103 lucr\u0103rile de modernizare au \u00eenceput \u00een martie-aprilie 2012 \u015fi se vor \u00eencheia \u00een iunie 2015. Tronsonul face parte din linia de cale ferat\u0103 Bra\u015fov-Simeria, parte a Coridorului IV paneuropean. Dup\u0103 finalizarea lucr\u0103rilor trenurile de c\u0103l\u0103tori ar trebui s\u0103 ating\u0103 o vitez\u0103 maxim\u0103 de 160 de kilometri pe or\u0103, iar cele de marf\u0103 de p\u00e2n\u0103 la 120 de kilometri pe or\u0103.<\/p>\n<p>\n<a href=\"http:\/\/zf.ro\" target=\"_blank\">Mai multe pe zf.ro<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ministerul Transporturilor a semnat vineri cu CFR SA un contract de finan\u0163are \u00een valoare de 4,98 miliarde de lei (1,1 miliarde euro) pentru reabilitarea tronsonului de cale ferat\u0103 Sighi\u015foara-Co\u015flariu (Alba), cu o lungime de 89,5 kilometri.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[510],"tags":[10874,12112,10119,31929,13578,29276],"class_list":["post-78093","post","type-post","status-publish","format-standard","hentry","category-actualitate","tag-alstom","tag-cale-ferata","tag-cfr","tag-lucent","tag-ministerul-transporturilor","tag-sighisoara"],"_links":{"self":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/78093","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=78093"}],"version-history":[{"count":1,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/78093\/revisions"}],"predecessor-version":[{"id":91394,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/78093\/revisions\/91394"}],"wp:attachment":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=78093"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=78093"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=78093"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}