{"id":77786,"date":"2013-02-05T13:37:22","date_gmt":"2013-02-05T13:37:22","guid":{"rendered":"https:\/\/bm.dev.synology.me\/?p=77786"},"modified":"2026-04-03T10:35:22","modified_gmt":"2026-04-03T10:35:22","slug":"spaniolii-de-la-copisa-fac-infrastructura-pentru-un-parc-eolian-de-120-mil-euro","status":"publish","type":"post","link":"https:\/\/bm.dev.synology.me\/?p=77786","title":{"rendered":"Spaniolii de la Copisa fac infrastructura pentru un parc eolian de 120 mil. euro"},"content":{"rendered":"<p>\nCompania de construc\u0163ii Copisa, cu capital spaniol, va executa lucr\u0103rile de infrastructur\u0103 aferente construc\u0163iei unui parc eolian de 80 MW la Chirnogeni, jude\u0163ul Constan\u0163a, printr-un contract \u00een valoare de 8 milioane de euro. \u00cen total investi\u0163ia \u00een acest parc eolian s-ar putea ridica la 120 de milioane de euro \u0163in\u00e2nd cont de faptul c\u0103 de obicei pentru a monta un megawatt \u00een acest domeniu sunt necesare fonduri de 1,5 mil. euro. Cele 32 de turbine care urmeaz\u0103 a fi instalate \u00een parcul eolian vor fi construite de compania german\u0103 Nordex pentru firma spaniol\u0103 Iberdrola, contractorul general al proiectului. Beneficiarul final al parcului eolian este EP Wind Project Six SA, firm\u0103 controlat\u0103 de fondul de investi\u0163ii Marguerite Fund, EP Global Energy (Cipru) \u015fi EnerCap Power Fund (Cehia), arat\u0103 un comunicat al Ciposa. Proiectul este al treilea de acest tip realizat de Copisa \u00een Rom\u00e2nia. Anterior, compania a realizat lucr\u0103rile civile pentru cele dou\u0103 etape ale parcului eolian Mihai Viteazu, de 80 MW, de\u0163inut de Iberdrola \u00een jude\u0163ul Constan\u0163a.<\/p>\n<p>\n<a href=\"http:\/\/zf.ro\" target=\"_blank\">Mai multe pe zf.ro<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Compania de construc\u0163ii Copisa, cu capital spaniol, va executa lucr\u0103rile de infrastructur\u0103 aferente construc\u0163iei unui parc eolian de 80 MW la Chirnogeni, jude\u0163ul Constan\u0163a, printr-un contract \u00een valoare de 8 milioane de euro.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[510],"tags":[31668,362,17572],"class_list":["post-77786","post","type-post","status-publish","format-standard","hentry","category-actualitate","tag-copisa","tag-infrastructura","tag-parc-eolian"],"_links":{"self":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/77786","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=77786"}],"version-history":[{"count":1,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/77786\/revisions"}],"predecessor-version":[{"id":91086,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/77786\/revisions\/91086"}],"wp:attachment":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=77786"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=77786"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=77786"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}