{"id":77785,"date":"2013-02-05T13:36:55","date_gmt":"2013-02-05T13:36:55","guid":{"rendered":"https:\/\/bm.dev.synology.me\/?p=77785"},"modified":"2026-04-03T10:35:21","modified_gmt":"2026-04-03T10:35:21","slug":"ge-va-monta-7-turbine-eoliene-de-30-mil-in-tulcea","status":"publish","type":"post","link":"https:\/\/bm.dev.synology.me\/?p=77785","title":{"rendered":"GE va monta 7 turbine eoliene de 30 mil. $ \u00een Tulcea"},"content":{"rendered":"<p>\nGrupul american General Electric (GE) va livra \u015fapte turbine de 2,5 MW fiecare pentru un parc eolian amplasat \u00een localitatea Cerna din jude\u0163ul Tulcea, precum \u015fi serviciile de mentenan\u0163\u0103 aferente, printr-un contract \u00een valoare total\u0103 de aproape 30 milioane de dolari. Proiectul are o capacitate de 17,5 MW \u015fi va produce energie suficient\u0103 pentru a alimenta aproximativ 7.000 de locuin\u0163e. Parcul eolian este de\u0163inut de compania Energie Verde Ventuno SRL, controlat\u0103 de Movipower SRL (Italia) \u015fi Energia Verde SA (Rom\u00e2nia). GE, unul dintre primii 10 produc\u0103tori de turbine la nivel mondial, a instalat p\u00e2n\u0103 \u00een prezent 265 de eoliene \u00een parcurile din Rom\u00e2nia, fiecare av\u00e2nd o capacitate de 2,5 MW. Cel mai important parc care folose\u015fte turbine GE este F\u00e2nt\u00e2nele &#8211; Cogealac, de\u0163inut de grupul ceh CEZ. Cu o capacitate de 600 MW, aproape c\u00e2t un reactor de la Cernavod\u0103, proiectul este cel mai mare parc eolian pe uscat din Europa.<\/p>\n<p>\n<a href=\"http:\/\/zf.ro\" target=\"_blank\">Mai multe pe zf.ro<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Grupul american General Electric (GE) va livra \u015fapte turbine de 2,5 MW fiecare pentru un parc eolian amplasat \u00een localitatea Cerna din jude\u0163ul Tulcea, precum \u015fi serviciile de mentenan\u0163\u0103 aferente, printr-un contract \u00een valoare total\u0103 de aproape 30 milioane de dolari.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[510],"tags":[150,31667,13022,31088],"class_list":["post-77785","post","type-post","status-publish","format-standard","hentry","category-actualitate","tag-energie","tag-ge","tag-tulcea","tag-turbine-eoliene"],"_links":{"self":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/77785","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=77785"}],"version-history":[{"count":1,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/77785\/revisions"}],"predecessor-version":[{"id":91085,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/77785\/revisions\/91085"}],"wp:attachment":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=77785"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=77785"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=77785"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}