{"id":245273,"date":"2026-02-20T12:39:12","date_gmt":"2026-02-20T12:39:12","guid":{"rendered":"https:\/\/bm.dev.synology.me\/?p=245273"},"modified":"2026-02-20T12:39:12","modified_gmt":"2026-02-20T12:39:12","slug":"e-on-drive-infrastructure-a-ajuns-la-500-de-puncte-de-incarcare-pentru-masini-electrice-instalate-in-39-de-judete","status":"publish","type":"post","link":"https:\/\/bm.dev.synology.me\/?p=245273","title":{"rendered":"E.ON Drive Infrastructure a ajuns la 500 de puncte de \u00eenc\u0103rcare pentru ma\u015fini electrice, instalate \u00een 39 de jude\u0163e"},"content":{"rendered":"<p>\nE.ON Drive Infrastructure, divizia de infrastructur\u0103 pentru mobilitate electric\u0103 a grupului E.ON, a ajuns la 500 de puncte de \u00eenc\u0103rcare la nivel na\u0163ional, instalate \u00een 39 de jude\u0163e, potrivit datelor companiei.<\/p>\n<p>\nCel mai recent punct de \u00eenc\u0103rcare a fost instalat \u00een Sibiu, \u00een cadrul Zacaria Retail Center, \u00een contextul extinderii re\u0163elelor dedicate mobilit\u0103\u0163ii electrice pe pia\u0163a local\u0103.<\/p>\n<p>\n\u201eAcest prag nu este doar un num\u0103r \u2014 este rezultatul unei strategii solide de investi\u0163ii, al unor parteneriate durabile \u015fi al cre\u015fterii accelerate a comunit\u0103\u0163ii de utilizatori de vehicule electrice din Rom\u00e2nia. (&#8230;). Continu\u0103m s\u0103 extindem re\u0163eaua pentru a o face \u015fi mai accesibil\u0103 \u015fi previzibil\u0103\u201d, spune Adrian Rot\u0103ra\u015f, General Manager E.ON Drive Infrastructure Rom\u00e2nia.<\/p>\n<p>\n\u00cen 2025, re\u0163eaua a furnizat peste 2 milioane kWh de energie pentru vehicule electrice, \u00een peste 110.000 de sesiuni de \u00eenc\u0103rcare, nivel aproximativ dublu fa\u0163\u0103 de anul anterior. Compania a inaugurat \u015fi un hub de \u00eenc\u0103rcare cu 50 de puncte \u00een Pite\u015fti, potrivit informa\u0163iilor comunicate.<\/p>\n<p>\nPotrivit planurilor anun\u0163ate, dezvoltarea infrastructurii \u00een 2026 se va concentra pe instalarea de sta\u0163ii ultra-rapide \u015fi huburi cu mai multe puncte de \u00eenc\u0103rcare \u00een acela\u015fi amplasament, pentru a reduce timpii de a\u015fteptare \u015fi a cre\u015fte disponibilitatea \u00een perioadele de v\u00e2rf.<\/p>\n<p>\nE.ON Drive Infrastructure&nbsp; opereaz\u0103 peste 8.000 de puncte de \u00eenc\u0103rcare publice \u00een 11 \u0163\u0103ri europene: Suedia, Danemarca, Germania, Polonia, Norvegia, Marea Britanie, Cehia, Italia, Olanda, Ungaria&nbsp;\u015fi&nbsp;Rom\u00e2nia.<\/p>\n<p>\n\u00cen Rom\u00e2nia, re\u0163eaua a fost extins\u0103 treptat \u00een ultimii ani, pe fondul cre\u015fterii interesului pentru mobilitatea electric\u0103 \u015fi al investi\u0163iilor \u00een infrastructur\u0103.<\/p>\n<p>\n<br \/>\n&nbsp;<\/p>\n<p>\n&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>E.ON Drive Infrastructure, divizia de infrastructur\u0103 pentru mobilitate electric\u0103 a grupului E.ON, a ajuns la 500 de puncte de \u00eenc\u0103rcare la nivel na\u0163ional, instalate \u00een 39 de jude\u0163e, potrivit datelor companiei. Cel mai recent punct de \u00eenc\u0103rcare a fost instalat \u00een Sibiu, \u00een cadrul Zacaria Retail Center, \u00een contextul extinderii re\u0163elelor dedicate mobilit\u0103\u0163ii electrice pe [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[510],"tags":[246,62685,13417,33618,98],"class_list":["post-245273","post","type-post","status-publish","format-standard","hentry","category-actualitate","tag-crestere","tag-e-on-drive-infrastructure","tag-masini-electrice","tag-mobilitate","tag-romania"],"_links":{"self":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/245273","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=245273"}],"version-history":[{"count":0,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/245273\/revisions"}],"wp:attachment":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=245273"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=245273"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=245273"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}