{"id":241643,"date":"2025-10-30T17:52:48","date_gmt":"2025-10-30T17:52:48","guid":{"rendered":"https:\/\/bm.dev.synology.me\/?p=241643"},"modified":"2025-10-30T17:52:48","modified_gmt":"2025-10-30T17:52:48","slug":"primaria-cluj-napoca-investeste-26-mil-euro-intr-un-pasaj-rutier-in-zona-bulevardului-muncii","status":"publish","type":"post","link":"https:\/\/bm.dev.synology.me\/?p=241643","title":{"rendered":"Prim\u0103ria Cluj-Napoca investe\u015fte 26 mil. euro \u00eentr-un pasaj rutier \u00een zona Bulevardului Muncii"},"content":{"rendered":"<p>\nPrim\u0103ria Cluj-Napoca a demarat un proiect de investi\u0163ii de 130,3 mil. lei (aproximativ 26 mil. euro),finan\u0163at din Fondul European de Dezvoltare Regional\u0103 (FEDR), prin Programul Regional Nord-Vest 2021-2027 \u015fi completat de contribu\u0163ii din bugetul na\u0163ional \u015fi bugetul local, ce prevede construc\u0163ia unui pasaj rutier \u00een zona Bulevardului Muncii.<\/p>\n<p>\n\u2019\u2019Proiectul de infrastructura pe care \u00eel avem \u00een derulare \u00een zona Bulevardului Muncii cuprinde reconfigurarea intersec\u0163iei str\u0103zii Oa\u015fului cu Bulevardul Muncii, prin construirea unui pasaj subteran de 275 de metri, construirea unui pod peste p\u00e2r\u00e2ul Chinteni, realizarea a 444 de metri de \u015fine de tramvai, reabilitarea carosabilului pe 2.150 mp \u015fi amenajarea de trotuare pe 4.300 mp, spa\u0163ii verzi pe 300 mp, sta\u0163ii de transport public \u015fi insule separatoare\u2019\u2019, a transmis Emil Boc, primarul municipiului Cluj-Napoca.<\/p>\n<p>\nTotodat\u0103, proiectul presupune instalarea a peste 200 de aparate de iluminat public, un sistem de monitorizare a traficului, dar \u015fi un sistem de informare a c\u0103l\u0103torilor \u00een sta\u0163iile de transport. Proiectul a fost aprobat \u00een \u015fedin\u0163a Consiliului Local, urm\u00e2nd eliberarea autoriza\u0163iei de construire \u015fi desf\u0103\u015furarea licita\u0163iei.<\/p>\n<p>\n&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Prim\u0103ria Cluj-Napoca a demarat un proiect de investi\u0163ii de 130,3 mil. lei (aproximativ 26 mil. euro),finan\u0163at din Fondul European de Dezvoltare Regional\u0103 (FEDR), prin Programul Regional Nord-Vest 2021-2027 \u015fi completat de contribu\u0163ii din bugetul na\u0163ional \u015fi bugetul local, ce prevede construc\u0163ia unui pasaj rutier \u00een zona Bulevardului Muncii. \u2019\u2019Proiectul de infrastructura pe care \u00eel avem [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[510],"tags":[61676,9597,149,58463],"class_list":["post-241643","post","type-post","status-publish","format-standard","hentry","category-actualitate","tag-bulevardul-muncii","tag-cluj-napoca","tag-investitii","tag-pasaj-rutier"],"_links":{"self":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/241643","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=241643"}],"version-history":[{"count":0,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/241643\/revisions"}],"wp:attachment":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=241643"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=241643"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=241643"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}