{"id":241375,"date":"2025-10-21T19:11:45","date_gmt":"2025-10-21T19:11:45","guid":{"rendered":"https:\/\/bm.dev.synology.me\/?p=241375"},"modified":"2026-04-11T14:17:49","modified_gmt":"2026-04-11T14:17:49","slug":"investitie-de-peste-25-mil-lei-pentru-construirea-unui-pasaj-suprateran-in-municipiul-oradea","status":"publish","type":"post","link":"https:\/\/bm.dev.synology.me\/?p=241375","title":{"rendered":"Investi\u0163ie de peste 25 mil. lei pentru construirea unui pasaj suprateran \u00een municipiul Oradea"},"content":{"rendered":"<p>\nPrim\u0103ria Oradea, \u00een parteneriat cu Consiliul Jude\u0163ean Bihor, \u015fi Compania Na\u0163ional\u0103 de Administrare a Infrastructurii Rutiere (CNAIR), implementeaz\u0103 un proiect de investi\u0163ii de peste 25,3 mil. lei (aproximativ 5 mil. euro), pentru construirea unui pasaj suprateran pe Calea Aradului, la ie\u015firea spre Arad (DN 79).<\/p>\n<p>\n\u2019\u2019Pasajul va avea o lungime total\u0103 de 535 de metri \u015fi va fi construit peste sensul giratoriu existent care asigur\u0103 accesul la centrele comerciale Era Shopping Park, Oradea Shopping Center \u015fi Dedeman. Lucr\u0103rile sunt executate de asocierea de firme Selina \u015fi Drum Asfalt \u015fi trebuie finalizate p\u00e2n\u0103 cel t\u00e2rziu la sf\u00e2r\u015fitul verii anului 2026\u2019\u2019, potrivit unui comunicat de pres\u0103 transmis de prim\u0103ria Oradea.<\/p>\n<p>\n\u00cen continuarea pasajului suprateran urmeaz\u0103 s\u0103 fie construit un al doilea pasaj. Acesta va fi subteran, pozi\u0163ionat la intersec\u0163ia dintre Calea Aradului \u015fi Centura Oradea \u015fi va avea o lungime total\u0103 de 406 metri. Valoarea lucr\u0103rilor este de 26,4 mil. lei, f\u0103r\u0103 TVA, se mai arat\u0103 \u00een comunicatul de pres\u0103 transmis de municipalitatea din Oradea.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Prim\u0103ria Oradea, \u00een parteneriat cu Consiliul Jude\u0163ean Bihor, \u015fi Compania Na\u0163ional\u0103 de Administrare a Infrastructurii Rutiere (CNAIR), implementeaz\u0103 un proiect de investi\u0163ii de peste 25,3 mil. lei (aproximativ 5 mil. euro), pentru construirea unui pasaj suprateran pe Calea Aradului, la ie\u015firea spre Arad (DN 79). \u2019\u2019Pasajul va avea o lungime total\u0103 de 535 de metri [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[510],"tags":[149,10576,15319],"class_list":["post-241375","post","type-post","status-publish","format-standard","hentry","category-actualitate","tag-investitii","tag-oradea","tag-pasaj"],"_links":{"self":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/241375","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=241375"}],"version-history":[{"count":1,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/241375\/revisions"}],"predecessor-version":[{"id":241384,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/241375\/revisions\/241384"}],"wp:attachment":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=241375"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=241375"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=241375"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}