{"id":240350,"date":"2025-09-17T18:47:01","date_gmt":"2025-09-17T18:47:01","guid":{"rendered":"https:\/\/bm.dev.synology.me\/?p=240350"},"modified":"2025-09-17T18:47:01","modified_gmt":"2025-09-17T18:47:01","slug":"reactia-ungurilor-de-la-mvm-in-legatura-cu-tranzactia-cu-e-on-intentia-noastra-este-sa-finalizam-tranzactia-si-ne-mentinem-increderea-ca-putem-intra-in-piata-energiei-ca-un-partener-al-statului-roman","status":"publish","type":"post","link":"https:\/\/bm.dev.synology.me\/?p=240350","title":{"rendered":"Reac\u0163ia ungurilor de la MVM \u00een leg\u0103tur\u0103 cu tranzac\u0163ia cu E.ON: Inten\u0163ia noastr\u0103 este s\u0103 finaliz\u0103m tranzac\u0163ia \u015fi ne men\u0163inem \u00eencrederea c\u0103 putem intra \u00een pia\u0163a energiei ca un partener al statului rom\u00e2n. Cine are ultimul cuv\u00e2nt de spus \u00eentr-una dintre cele mai controversate tranzac\u0163ii din energie?"},"content":{"rendered":"<p>\nGrupul energetic maghiar MVM spune c\u0103 nu renun\u0163\u0103 la preluarea E.ON Energie Rom\u00e2nia de\u015fi Comisia pentru Examinarea Investi\u0163iilor Str\u0103ine Directe (CEISD) a dat aviz negativ pentru preluare iar MVM s-a retras din mecansimul FSR (Foreign Subsidies Regulation) prin care ar fi trebuit s\u0103 dea informa\u0163ii suplimentare c\u0103tre Comisia European\u0103.<\/p>\n<p>\nCu toate acestea, decizia final\u0103 va fi luat\u0103 Consiliul Suprem de Ap\u0103rare al \u0163\u0103rii (CSAT). Pre\u015fedintele statului, Nicu\u015for Dan, \u00eendepline\u015fte func\u0163ia de \u015fef al CSAT, iar premierul Ilie Bolojan este vicepre\u015fedintele acestui for.<\/p>\n<p>\nCEISD a declan\u015fat procedura de verificare pe 14 februarie 2025, \u00eentr-o tranzac\u0163ie \u00een care MVM Energy ar fi urmat s\u0103 cumpere 68,18% din E.ON Energie Rom\u00e2nia, respectiv 97,92% din E.ON Asist Complet.<\/p>\n<p>\n\u201cAngajamentul Grupului MVM fa\u0163\u0103 de tranzac\u0163ie nu s-a schimbat. Inten\u0163ia noastr\u0103 este s\u0103 finaliz\u0103m achizi\u0163ia, \u00een parteneriat cu EON. MVM a decis s\u0103 se retrag\u0103 temporar doar din procesul FSR. Continu\u0103m s\u0103 avem \u00eencredere c\u0103 putem intra pe pia\u0163\u0103 ca partener al statului roman\u201d, au r\u0103spuns reprezentan\u0163ii MVM solicit\u0103rii ZF.<\/p>\n<p>\n\u201c\u00cen ciuda dificult\u0103\u0163ilor mai mari dec\u00e2t ne-am a\u015fteptat cu care ne confrunt\u0103m \u00een prezent \u00een Rom\u00e2nia \u00een leg\u0103tur\u0103 cu aprobarea FDI (investi\u0163ie str\u0103in\u0103 direct\u0103) pentru tranzac\u0163ia prev\u0103zut\u0103, r\u0103m\u00e2nem pe deplin angaja\u0163i \u015fi facem tot ce ne st\u0103 \u00een putin\u0163\u0103 pentru a ob\u0163ine aprobarea necesar\u0103 \u015fi a finaliza cu succes tranzac\u0163ia. Cu toate acestea, av\u00e2nd \u00een vedere necesitatea de a echilibra costurile \u015fi resursele noastre \u015fi \u0163in\u00e2nd cont de incertitudinea actual\u0103 cu privire la calendarul \u015fi rezultatul deciziei FDI, MVM a decis s\u0103 se retrag\u0103 temporar din procesul FSR. Inten\u0163ion\u0103m s\u0103 relu\u0103m procesul de \u00eendat\u0103 ce va exista o mai mare claritate cu privire la un rezultat pozitiv al FDI. Dorim s\u0103 subliniem c\u0103 aceast\u0103 decizie se refer\u0103 numai la procedura FSR. Ea nu reflect\u0103 nicio schimbare \u00een angajamentul nostru fa\u0163\u0103 de tranzac\u0163ia \u00een sine. Inten\u0163ia noastr\u0103 strategic\u0103 de a finaliza achizi\u0163ia \u015fi de a colabora cu succes cu E.ON r\u0103m\u00e2ne neschimbat\u0103\u201d, au subliniat reprezentan\u0163ii MVM.<\/p>\n<p>\nCare au fost argumentele cu care Ministerul Energiei s-a dus la CEISD pentru a ob\u0163ine un aviz negative pe aceast\u0103 tranzac\u0163ie:<\/p>\n<p>\n<strong>\u2666<\/strong><strong>&nbsp;Leg<\/strong><strong>\u0103<\/strong><strong>turi cu Federa<\/strong><strong>\u0163<\/strong><strong>ia Rus<\/strong><strong>\u0103<\/strong><strong>:<\/strong><\/p>\n<p>\nMVM Zrt. are rela\u0163ii comerciale extinse cu Gazprom \u015fi Rosatom, companii ruse\u015fti aflate sub sanc\u0163iuni interna\u0163ionale, prin care Ungaria \u00ee\u015fi men\u0163ine o dependen\u0163\u0103 ridicat\u0103 de gazele naturale \u015fi tehnologia nuclear\u0103 din Rusia.<\/p>\n<p>\nAu fost identificate elemente de \u201cdecisive influence, shadow control, influence by economic dependence \u015fi effective control\u201d, at\u00e2t \u00een cadrul MVM Grup c\u00e2t \u015fi a societ\u0103\u0163ii prin intermediul c\u0103reia se inten\u0163ioneaz\u0103 cump\u0103rarea pachetului majoritar al E.ON Energie Rom\u00e2nia.<\/p>\n<p>\n<strong>\u2666<\/strong><strong>&nbsp;&nbsp;Riscul cesiunii ulterioare a ac<\/strong><strong>\u0163<\/strong><strong>iunilor E.ON Energie Rom<\/strong><strong>\u00e2<\/strong><strong>nia c<\/strong><strong>\u0103<\/strong><strong>tre entit<\/strong><strong>\u0103\u0163<\/strong><strong>i non UE<\/strong><\/p>\n<p>\nDin analiza documenta\u0163iei depuse de MVM rezult\u0103 c\u0103 structura contractual\u0103 \u015fi clauzele aferente tranzac\u0163iei genereaz\u0103 o posibilitate de cesiune ulterioar\u0103 a participa\u0163iilor cump\u0103rate de la E.ON Energie Rom\u00e2nia c\u0103tre entit\u0103\u0163i din afara Uniunii Europene sau c\u0103tre alte entit\u0103\u0163i care nu figureaz\u0103 ca p\u0103r\u0163i ini\u0163iale ale tranzac\u0163iei. Aceast\u0103 vulnerabilitate contractual\u0103 poate facilita transferul indirect al controlului c\u0103tre actori economici sau politici ce nu respect\u0103 rigorile \u015fi standardele de conformitate impuse de legisla\u0163ia european\u0103 \u00een domeniul energetic \u015fi transparen\u0163\u0103 a tranzac\u0163iilor.<\/p>\n<p>\n<strong>\u2666<\/strong><strong>&nbsp;&nbsp;Probleme de transparen<\/strong><strong>\u0163\u0103<\/strong><strong> a cump<\/strong><strong>\u0103<\/strong><strong>r<\/strong><strong>\u0103<\/strong><strong>torului<\/strong><\/p>\n<p>\nS-au constatat declara\u0163iile incomplete \u015fi provenien\u0163a neclar\u0103 a fondurilor MVM pentru aceast\u0103 achizi\u0163ie, ridic\u00e2nd suspiciuni privind respectarea legisla\u0163iei europene \u00een materie de prevenire a sp\u0103l\u0103rii banilor \u015fi a regulilor concuren\u0163iale. Trebuie analizat \u015fi valoarea propus\u0103 a tranzac\u0163iei.<\/p>\n<p>\nExist\u0103 date conform c\u0103rora raporturile comerciale ale MVM cu companii controlate de Federa\u0163ia Rus\u0103 au la baz\u0103 prestarea unor bunuri \u015fi servicii la tarife care genereaz\u0103 o capitalizare indirect\u0103 a grupului MVM cu fonduri din afara Uniunii Europene.<\/p>\n<p>\n&nbsp;<\/p>\n<p>\n&nbsp;<\/p>\n<p>\n&nbsp;<\/p>\n<p>\n&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Grupul energetic maghiar MVM spune c\u0103 nu renun\u0163\u0103 la preluarea E.ON Energie Rom\u00e2nia de\u015fi Comisia pentru Examinarea Investi\u0163iilor Str\u0103ine Directe (CEISD) a dat aviz negativ pentru preluare iar MVM s-a retras din mecansimul FSR (Foreign Subsidies Regulation) prin care ar fi trebuit s\u0103 dea informa\u0163ii suplimentare c\u0103tre Comisia European\u0103. Cu toate acestea, decizia final\u0103 va [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[511],"tags":[9945,150,10595,293,400],"class_list":["post-240350","post","type-post","status-publish","format-standard","hentry","category-afaceri","tag-e-on","tag-energie","tag-incredere","tag-intrare","tag-tranzactie"],"_links":{"self":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/240350","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=240350"}],"version-history":[{"count":0,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/240350\/revisions"}],"wp:attachment":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=240350"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=240350"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=240350"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}