{"id":238577,"date":"2025-07-18T16:02:26","date_gmt":"2025-07-18T16:02:26","guid":{"rendered":"https:\/\/bm.dev.synology.me\/?p=238577"},"modified":"2025-07-18T16:02:26","modified_gmt":"2025-07-18T16:02:26","slug":"consiliul-concurentei-analizeaza-tranzactia-prin-care-energy-distribution-services-intentioneaza-sa-preia-trei-centrale-eoliene-din-judetele-tulcea-si-constanta","status":"publish","type":"post","link":"https:\/\/bm.dev.synology.me\/?p=238577","title":{"rendered":"Consiliul Concuren\u0163ei analizeaz\u0103 tranzac\u0163ia prin care Energy Distribution Services inten\u0163ioneaz\u0103 s\u0103 preia trei centrale eoliene din jude\u0163ele Tulcea \u015fi Constan\u0163a"},"content":{"rendered":"<p style=\"text-align: justify;\">\nConsiliul Concuren\u0163ei analizeaz\u0103 tranzac\u0163ia prin care Energy Distribution Services (EDS) SRL inten\u0163ioneaz\u0103 s\u0103 preia trei centrale eoliene de\u0163inute de firmele Ground Investment Corp SRL, Elektra Wind Power SRL \u015fi Elektra Green Power SRL.<\/p>\n<p style=\"text-align: justify;\">\nEDS, cu afaceri de aproape 2 mld.lei \u00een 2024, este&nbsp;<span background-color:=\"\" color:=\"\" font-family:=\"\" font-size:=\"\">controlat\u0103 de o firm\u0103 de\u0163inut\u0103 de fra\u0163ii Sorina-Liana Mirea \u015fi Costin Mirea, copiii lui Marian Mirea, fost \u015fef al Hidroconstruc\u0163ia Olt.<\/span><\/p>\n<p style=\"text-align: justify;\">\n<span background-color:=\"\" color:=\"\" font-family:=\"\" font-size:=\"\">Potrivit Consiliului Concuren\u0163ei,&nbsp;&nbsp;<\/span>Energy Distribution Services SRL, Ground Investment Corp SRL, Elektra Wind Power SRL \u015fi Elektra Green Power SRL ac\u0163ioneaz\u0103 pe pie\u0163ele produc\u0163iei \u015fi comercializ\u0103rii de energie electric\u0103, respectiv de certificate verzi, la nivel na\u0163ional.<\/p>\n<p style=\"text-align: justify;\">\nGround Investment Corp de\u0163ine \u015fi opereaz\u0103 centrala electric\u0103 CEE Babadag 3, care a fost pus\u0103 \u00een func\u0163iune \u00een anul 2016.<\/p>\n<p style=\"text-align: justify;\">\nElektra Wind Power SRL de\u0163ine \u015fi opereaz\u0103 centrala electric\u0103 CEE Tortomanu 3, pus\u0103 \u00een func\u0163iune \u00een anul 2012, iar Elektra Green Power SRL de\u0163ine \u015fi opereaz\u0103 centrala electric\u0103 CEE Tortomanu 2, pus\u0103 \u00een func\u0163iune \u00een 2011.<\/p>\n<p style=\"text-align: justify;\">\n\u00cen conformitate cu prevederile Legii concuren\u0163ei, aceast\u0103 tranzac\u0163ie trebuie autorizat\u0103 de Consiliul Concuren\u0163ei, care o va evalua \u00een scopul stabilirii compatibilit\u0103\u0163ii sale cu un mediu concuren\u0163ial normal \u015fi va emite o decizie \u00een termenele prev\u0103zute de lege.<\/p>\n<p style=\"text-align: justify;\">\nEnergy Distribution Services a raportat \u00een 2024 o cifr\u0103 de afaceri de 1,8 miliarde lei, fa\u0163\u0103 de 3,9 miliarde lei \u00een 2023, \u015fi un profit net de 23 milioane lei, de la 110 milioane lei \u00een 2023.&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Consiliul Concuren\u0163ei analizeaz\u0103 tranzac\u0163ia prin care Energy Distribution Services (EDS) SRL inten\u0163ioneaz\u0103 s\u0103 preia trei centrale eoliene de\u0163inute de firmele Ground Investment Corp SRL, Elektra Wind Power SRL \u015fi Elektra Green Power SRL. EDS, cu afaceri de aproape 2 mld.lei \u00een 2024, este&nbsp;controlat\u0103 de o firm\u0103 de\u0163inut\u0103 de fra\u0163ii Sorina-Liana Mirea \u015fi Costin Mirea, copiii [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[510],"tags":[10753,8596,15646],"class_list":["post-238577","post","type-post","status-publish","format-standard","hentry","category-actualitate","tag-centrala","tag-consiliul-concurentei","tag-detinere"],"_links":{"self":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/238577","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=238577"}],"version-history":[{"count":0,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/238577\/revisions"}],"wp:attachment":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=238577"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=238577"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=238577"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}