{"id":233846,"date":"2025-02-06T16:38:42","date_gmt":"2025-02-06T16:38:42","guid":{"rendered":"https:\/\/bm.dev.synology.me\/?p=233846"},"modified":"2025-02-06T16:38:42","modified_gmt":"2025-02-06T16:38:42","slug":"autostrada-de-un-miliard-de-euro-s-a-deschis-licitatia-pentru-un-nou-lot-din-a8-motca-iasi-ungheni","status":"publish","type":"post","link":"https:\/\/bm.dev.synology.me\/?p=233846","title":{"rendered":"Autostrada de un miliard de euro: S-a deschis licita\u0163ia pentru un nou lot din A8 Mo\u0163ca-Ia\u015fi-Ungheni"},"content":{"rendered":"<p background-attachment:=\"\" background-clip:=\"\" background-image:=\"\" background-origin:=\"\" background-position:=\"\" background-repeat:=\"\" background-size:=\"\" color:=\"\" font-family:=\"\" font-size:=\"\" line-height:=\"\" margin:=\"\">\nCNIR, Compania Na\u0163ional\u0103 de Investi\u0163ii Rutiere, ? ?????? ???????\u0326?? ?????? ??????????? ?\u0326? ??????\u0326?? ??????????? ? ?? ????????\u0306??? ???\u0326??-???\u0326?-??????? \u015fi t??????? ?????? ????????? ????????? ???? ?? ?????? ????.<o:p>&nbsp;<\/o:p><\/p>\n<p background-attachment:=\"\" background-clip:=\"\" background-image:=\"\" background-origin:=\"\" background-position:=\"\" background-repeat:=\"\" background-size:=\"\" color:=\"\" font-family:=\"\" font-size:=\"\" line-height:=\"\" margin:=\"\">\n<span color:=\"\" font-family:=\"\" font-size:=\"\" romhelv=\"\">Tronsonul 2 T\u00e2rgu Frumos-Le\u0163cani cu o lungime de 28,6 kilometri are un cost estimat de 5 miliarde lei, iar finan\u0163area investi\u0163iei este asigurat\u0103 din fonduri europene, prin Programul Transport PT 2021-2027.&nbsp;<o:p>&nbsp;<\/o:p><\/span><\/p>\n<p background-attachment:=\"\" background-clip:=\"\" background-image:=\"\" background-origin:=\"\" background-position:=\"\" background-repeat:=\"\" background-size:=\"\" color:=\"\" font-family:=\"\" font-size:=\"\" line-height:=\"\" margin:=\"\">\n<span color:=\"\" font-family:=\"\" font-size:=\"\" romhelv=\"\">Astfel, lotul va avea un pre\u0163 per kilometru de circa 35 mil. euro.&nbsp;<o:p>&nbsp;<\/o:p><\/span><\/p>\n<p background-attachment:=\"\" background-clip:=\"\" background-image:=\"\" background-origin:=\"\" background-position:=\"\" background-repeat:=\"\" background-size:=\"\" color:=\"\" font-family:=\"\" font-size:=\"\" line-height:=\"\" margin:=\"\">\n<span color:=\"\" font-family:=\"\" font-size:=\"\" romhelv=\"\">Este un proiect cu o complexitate tehnic\u0103 ridicat\u0103 \u015fi provoc\u0103ri pentru constructori, pe traseu fiind prev\u0103zute urm\u0103toarele structuri &#8211; ?? ?? ?????? ?\u0326? ?????? (cu o lungime total\u0103 de 7,8 kilometri\/cel mai lung pasaj de 1130 de metri peste r\u00e2ul Bahlui); dou\u0103 tunele \u015fi 3 noduri (Nod Podu Iloaiei, Nod Le\u0163cani, Nod la Drumul de Leg\u0103tur\u0103 cu DN 28).<o:p>&nbsp;<\/o:p><\/span><\/p>\n<p background-attachment:=\"\" background-clip:=\"\" background-image:=\"\" background-origin:=\"\" background-position:=\"\" background-repeat:=\"\" background-size:=\"\" color:=\"\" font-family:=\"\" font-size:=\"\" line-height:=\"\" margin:=\"\">\n<span color:=\"\" font-family:=\"\" font-size:=\"\" romhelv=\"\">Durata de realizare a \u00eentregului tronson 2 T\u00e2rgu Frumos-Le\u0163cani (28,6) este de 46 de luni (10 pentru proiectare \u015fi 36 de luni pentru execu\u0163ie). Pentru a asigura finalizarea \u00een cel mult 14 luni a segmentului de autostrad\u0103 care va func\u0163iona ca o ???????\u0306 ? ????????\u0306?\u0326?? ???? ???????, CNIR a prev\u0103zut acordarea punctajului suplimentar constructorului care \u00ee\u015fi asum\u0103 \u015fi prioritizeaz\u0103 acest segment cu o lungime de 4 kilometri.<o:p>&nbsp;<\/o:p><\/span><\/p>\n<p background-attachment:=\"\" background-clip:=\"\" background-image:=\"\" background-origin:=\"\" background-position:=\"\" background-repeat:=\"\" background-size:=\"\" color:=\"\" font-family:=\"\" font-size:=\"\" line-height:=\"\" margin:=\"\">\n<span color:=\"\" font-family:=\"\" font-size:=\"\" romhelv=\"\">\u00cen cadrul contractului vor mai fi executate, inclusiv :&nbsp;<o:p>&nbsp;<\/o:p><\/span><\/p>\n<p background-attachment:=\"\" background-clip:=\"\" background-image:=\"\" background-origin:=\"\" background-position:=\"\" background-repeat:=\"\" background-size:=\"\" color:=\"\" font-family:=\"\" font-size:=\"\" line-height:=\"\" margin:=\"\">\n<span color:=\"\" font-family:=\"\" font-size:=\"\" romhelv=\"\">-Drum de Leg\u0103tur\u0103 cu 2 benzi cu DN 28 D \u00een lungime de 5,23 km.<o:p>&nbsp;<\/o:p><\/span><\/p>\n<p background-attachment:=\"\" background-clip:=\"\" background-image:=\"\" background-origin:=\"\" background-position:=\"\" background-repeat:=\"\" background-size:=\"\" color:=\"\" font-family:=\"\" font-size:=\"\" line-height:=\"\" margin:=\"\">\n<span color:=\"\" font-family:=\"\" font-size:=\"\" romhelv=\"\">-Drum de Leg\u0103tur\u0103 cu 4 benzi cu DN 28 \u00een lungime de 7,6 km.<o:p>&nbsp;<\/o:p><\/span><\/p>\n<p background-attachment:=\"\" background-clip:=\"\" background-image:=\"\" background-origin:=\"\" background-position:=\"\" background-repeat:=\"\" background-size:=\"\" color:=\"\" font-family:=\"\" font-size:=\"\" line-height:=\"\" margin:=\"\">\n<span color:=\"\" font-family:=\"\" font-size:=\"\" romhelv=\"\">-2 parc\u0103ri de scurt\u0103 durat\u0103, un spa\u0163iu de servicii tip S 3, un Centru de \u00centre\u0163inere \u015fi Coordonare- CIC.&nbsp;<o:p>&nbsp;<\/o:p><\/span><\/p>\n<p background-attachment:=\"\" background-clip:=\"\" background-image:=\"\" background-origin:=\"\" background-position:=\"\" background-repeat:=\"\" background-size:=\"\" color:=\"\" font-family:=\"\" font-size:=\"\" line-height:=\"\" margin:=\"\">\n<span color:=\"\" font-family:=\"\" font-size:=\"\" romhelv=\"\">Anun\u0163ul de licita\u0163ie va fi vizibil \u00een SEAP dup\u0103 publicarea \u00een Jurnalul Oficial al Uniunii Europene.<o:p>&nbsp;<\/o:p><\/span><\/p>\n<p background-attachment:=\"\" background-clip:=\"\" background-image:=\"\" background-origin:=\"\" background-position:=\"\" background-repeat:=\"\" background-size:=\"\" color:=\"\" font-family:=\"\" font-size:=\"\" line-height:=\"\" margin:=\"\">\n<span color:=\"\" font-family:=\"\" font-size:=\"\" romhelv=\"\">Construirea Tronsonului 1 Mo\u0163ca-T\u00e2rgu Frumos (27 km), lansat \u00een licita\u0163ie pe 23 ianuarie 2025 \u015fi a tronsonului 2 T\u00e2rgu Frumos-Le\u0163cani, care asigur\u0103 leg\u0103tura municipiului Ia\u015fi la Autostrada Moldovei -A 7 \u015fi mai departe la Autostrada Transilvaniei -A3, reprezint\u0103 obiective prioritare ale Companiei. Realizarea celor dou\u0103 tronsoane devine o necesitate \u015fi din perspectiva evolu\u0163iei fluxurilor de trafic, \u00een sensul cre\u015fterii acestora \u00eentre Mo\u0163ca \u015fi Ia\u015fi, a\u015fa cum reiese din scenariile prezentate \u00een tabelul al\u0103turat.<o:p>&nbsp;<\/o:p><\/span><\/p>\n<p background-attachment:=\"\" background-clip:=\"\" background-image:=\"\" background-origin:=\"\" background-position:=\"\" background-repeat:=\"\" background-size:=\"\" color:=\"\" font-family:=\"\" font-size:=\"\" line-height:=\"\" margin:=\"\">\n<span color:=\"\" font-family:=\"\" font-size:=\"\" romhelv=\"\">Valorile de trafic sunt estim\u0103rile realizate \u00een cadrul documenta\u0163iei de specialitate a Studiului de Fezabilitate.<o:p>&nbsp;<\/o:p><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>CNIR, Compania Na\u0163ional\u0103 de Investi\u0163ii Rutiere, ? ?????? ???????\u0326?? ?????? ??????????? ?\u0326? ??????\u0326?? ??????????? ? ?? ????????\u0306??? ???\u0326??-???\u0326?-??????? \u015fi t??????? ?????? ????????? ????????? ???? ?? ?????? ????.&nbsp; Tronsonul 2 T\u00e2rgu Frumos-Le\u0163cani cu o lungime de 28,6 kilometri are un cost estimat de 5 miliarde lei, iar finan\u0163area investi\u0163iei este asigurat\u0103 din fonduri europene, prin Programul [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[510],"tags":[7460,7299],"class_list":["post-233846","post","type-post","status-publish","format-standard","hentry","category-actualitate","tag-autostrada","tag-licitatie"],"_links":{"self":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/233846","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=233846"}],"version-history":[{"count":0,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/233846\/revisions"}],"wp:attachment":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=233846"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=233846"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=233846"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}