{"id":227030,"date":"2024-05-23T20:16:54","date_gmt":"2024-05-23T20:16:54","guid":{"rendered":"https:\/\/bm.dev.synology.me\/?p=227030"},"modified":"2024-05-23T20:16:54","modified_gmt":"2024-05-23T20:16:54","slug":"cand-toti-vorbesc-de-investitii-de-miliarde-de-euro-sustinute-din-facturi-in-productia-de-energie-si-in-retele-intrebarea-cheie-ramane-fara-raspuns-cum-creste-consumul-focusul-trebuie-sa","status":"publish","type":"post","link":"https:\/\/bm.dev.synology.me\/?p=227030","title":{"rendered":"C\u00e2nd to\u0163i vorbesc de investi\u0163ii de miliarde de euro, sus\u0163inute din facturi, \u00een produc\u0163ia de energie \u015fi \u00een re\u0163ele, \u00eentrebarea cheie r\u0103m\u00e2ne f\u0103r\u0103 r\u0103spuns: cum cre\u015fte consumul? \u201eFocusul trebuie s\u0103 fie pe cre\u015ftere. Dac\u0103 pl\u0103cinta va fi mai mare, avem bani de tranzi\u0163ie\u201c"},"content":{"rendered":"<p>\n<em><strong><span style=\"color:#b22222;\">\u2666<\/span> China a bifat anul trecut o cre\u015ftere a consumului de energie de 7%, iar pentru anul acesta este estimat un plus de 10%, \u00een timp ce la nivelul UE consumul de energie a \u00eenregistrat o sc\u0103dere de peste 3% anul trecut, speran\u0163a fiind s\u0103 ajung\u0103 la un procent de cre\u015ftere de 2% \u00een perioada 2024-2026&nbsp;<span style=\"color:#b22222;\">\u2666<\/span> F\u0103r\u0103 revitalizarea cererii, planurile enorme de investi\u0163ii \u00een domeniul producerii de regenerabile \u015fi \u00een re\u0163ele r\u0103m\u00e2n f\u0103r\u0103 obiect \u015fi se transform\u0103 \u00een motive inutile de cre\u015ftere a facturilor, dar \u015fi \u00een probleme pentru gestionarea sistemului<span style=\"color:#b22222;\">&nbsp;\u2666<\/span> Ce va inversa tendin\u0163a? P\u0103rerile sunt \u00eemp\u0103r\u0163ite, a\u015fa a reie\u015fit din cea de-a doua zi a Eurelectric Power Summit, unul dintre cele mai mari evenimente destinate sectorului energetic, \u0163inut la Atena.<\/strong><\/em><\/p>\n<p>\nEurelectric este cea mai puternic\u0103 organiza\u0163ie euro\u00adpean\u0103 dedicat\u0103 sus\u00ad\u0163i\u00adnerii intereselor in\u00addustriei energetice, care reune\u015fte mai bine de 3.500 de compa\u00adnii din domeniului utilit\u0103\u0163ilor \u015fi al producerii de energie.<\/p>\n<p>\n\u201eMiz\u0103m pe o cre\u015ftere a consumu\u00adlui de energie de 10%. Am ajuns la costuri de 0,4 milioane de euro pe MW pentru eoliene \u015fi la 0,3 milioane de euro pe MW pentru solare. Am investit 60 de miliarde de euro \u00een re\u0163ele. Am ajuns la o capacitate de stocare a energiei de 35 GW\u201c, a spus Liu Zehong, executive vice chairman, Global Energy Interconnection De\u00adve\u00adlop\u00adment and Cooperation Organi\u00adzation (GEIDCO), care anterior a ocupat func\u0163ia de executive vice president al State Grid Corporation of China (SGCC). Declara\u0163iile f\u0103cute de Liu Zehong descriu un peisaj mult diferit fa\u0163\u0103 de ceea ce se \u00eent\u00e2mpl\u0103 pe plan european, inclusiv Rom\u00e2nia, unde cererea de energie nu pare a-\u015fi g\u0103si for\u0163ele pentru o revenire. \u00cen acest timp, se vorbe\u015fte despre un necesar de investi\u0163ii de 67 de miliarde de euro \u00een re\u0163elele UE \u015fi de planuri pentru mii \u015fi mii de MW de producere de ener\u00adgie pentru care \u00een acest moment nu exist\u0103 un consumator.<\/p>\n<p>\nDatele Inter\u00adna\u00adtional Energy Agency arat\u0103 c\u0103 pen\u00adtru anii 2024-2026, cererea de energie la nivelul UE ar putea avea un ritm de cre\u015ftere de circa 2%, infim pentru a sus\u0163ine o dezvol\u00adta\u00adre suportabil\u0103, mai ales pentru consu\u00admatori, a industriei. Ce va determina cre\u015fterea consumu\u00adlui? P\u0103rerile sunt \u00eem\u00adp\u0103r\u0163ite. \u201eDup\u0103 valul de cre\u015ftere a so\u00adcial media \u015fi cloud, suntem la al trei\u00adlea val marcat de inteligen\u0163a artificial\u0103 care va duce la dezvoltarea centrelor de date, mari consumatoare de ener\u00adgie. Am \u00eenceput c\u00e2nd oamenii \u015fi-au dat seama c\u0103 \u00ee\u015fi iubesc pisicile \u015fi c\u00e2inii \u015fi au \u00eenceput s\u0103 posteze. Vorbim acum de puteri de GW \u015fi vorbim de o cerere care nici m\u0103car nu exista \u00een ultimele nou\u0103 luni. Se fac contracte pe termen lung pentru alimentarea acestor centre cu 80 de dolari pe MWh, peste pre\u0163ul pie\u0163ei\u201c, a declarat Arshad Mansoor, pre\u015fedinte \u015fi CEO, EPRI (Electric Power Research Institute), o organiza\u00ad\u0163ie de research pe teme energetice din SUA. Nu to\u0163i sunt \u00eens\u0103 de p\u0103rere c\u0103 centrele de date vor putea rezolva dile\u00adma cre\u015fterii consumului de energie, mai ales pentru Europa.<\/p>\n<p>\n\u201eAm trecut prin prea multe bule ca s\u0103 mai cred una. Cererea de date din cloud a fost mai degrab\u0103 liniar\u0103. De ce? Pentru c\u0103 industria aceast\u0103 inoveaz\u0103. Ideea c\u0103 un creier artificial va \u00eenlocui creierul uman este la fel de verosimil\u0103 ca bula cu ma\u015finile autonome. Cererea de energie care va veni din zona de \u00eenc\u0103lzire, transport \u015fi industria va face ca cererea din centrele de date s\u0103 par\u0103 nesemnificativ\u0103\u201c, a replicat Michael Liebreich, CEO, Liebreich Associates, expert \u00een domeniul energetic.<\/p>\n<p>\nSperan\u0163a este c\u0103 totu\u015fi indiferent de ce va determina cre\u015fterea cererii, s\u0103 exist\u0103 acel ceva.<\/p>\n<p>\n\u201eSunt tehnologii pe care trebuie s\u0103 le studiem mai mult. Cererea va cre\u015fte oricum, chiar dac\u0103 de la IA sau electrificare\u201c, a spus Kristian Ruby, secretar general, Eurelectric. Problema este c\u0103 f\u0103r\u0103 aceast\u0103 cre\u015ftere a cererii, care de fapt se traduce \u00een cre\u015ftere de PIB, factura tranzi\u0163iei este greu de suportat, \u00eentregul fenomen \u00een sine pierz\u00e2ndu-\u015fi din consisten\u0163\u0103. \u201eElectrificarea este esen\u0163ial\u0103 \u015fi nu este o problem\u0103 de bani, cu condi\u0163ia s\u0103 cre\u015ftem. Dac\u0103 pl\u0103cinta se face mai mare, vom putea face tranzi\u0163ia. Focusul trebuie s\u0103 fie pe cre\u015ftere\u201c, a atras aten\u0163ia Leonhard Birnbaum, CEO-ul grupului E.ON.<\/p>\n<p>\nEconomiile europene, la r\u00e2ndul lor, mizeaz\u0103 pe cre\u015fterea consumului de energie.<\/p>\n<p>\n\u201eElectrificarea are un poten\u0163ial uria\u015f. Ne a\u015ftept\u0103m la o cre\u015ftere de 40-50% a cererii de energie p\u00e2n\u0103 \u00een 2030, aceasta fiind motiva\u0163ia pentru proiectul nostru nuclear. Avem 6 GW de energie solar\u0103 conecta\u0163i la re\u0163ea. Am lansat proiectul de contracte pentru diferen\u0163\u0103 pentru baterii \u015fi vom cre\u015fte la 450 MW p\u00e2n\u0103 \u00een 2026 de la 25 MW\u201c, a descris situ\u0163ia din Ungaria, Attila Steiner, secretar de stat pentru energie \u015fi politici de mediu \u00een cadrul Ministerului Energiei maghiar. \u00cencep\u00e2nd cu 1 iulie 2024, la pu\u0163in timp dup\u0103 alegerile europene, Ungaria va prelua pre\u015fedin\u0163ia rotativ\u0103 a Consiliului European, institu\u0163ie cheie care define\u015fte politicile \u015fi priorit\u0103\u0163ile UE.<\/p>\n<p>\nDirec\u0163iile care vor fi adoptate, \u00een lipsa unei cre\u015fteri solide a economiilor europene, se pot desc\u0103rca \u00een facturile pl\u0103tite de consumatori \u015fi tocmai de aceea focusul trebuie s\u0103 fie pe dezvoltare.<\/p>\n<p>\n\u201eIndustria \u015fi-a pierdut focusul. Tat\u0103l meu are peste 80 de ani \u015fi niciodat\u0103 nu \u015fi-a citit factura. Asta p\u00e2n\u0103 acum. Porne\u015fte \u015fi opre\u015fte radiatorul pentru a putea face economii. Politicienii europeni ar trebui s\u0103 se concentreze mai mult pe cet\u0103\u0163enii lor, nu s\u0103 lupte pentru al\u0163ii. Trebuie s\u0103 ne concentr\u0103m mai mult pe unitate\u201c, a conchis K\u00e1roly M\u00e1trai, CEO, MVM Group, grup energetic integrat pe vertical\u0103 de\u0163inut de statul maghiar. Spre compara\u0163ie de Ungaria, care a fost bine reprezentat\u0103 la summitul Eurelectric, niciun oficial rom\u00e2n sau executiv de nivel \u00eenalt al vreunei companii rom\u00e2ne\u015fti din domeniul energetic nu a avut vreo interven\u0163ie \u00een cadrul summitului de la Atena.<\/p>\n<p>\n\u201eElectrificarea are un poten\u0163ial uria\u015f. Ne a\u015ftept\u0103m la o cre\u015ftere de 40-50% a cererii de energie p\u00e2n\u0103 \u00een 2030, aceasta fiind motiva\u0163ia pentru proiectul nostru nuclear. Avem 6 GW de energie solar\u0103 conecta\u0163i la re\u0163ea. Am lansat proiectul de contracte pentru diferen\u0163\u0103 pentru baterii \u015fi vom cre\u015fte la 450 MW p\u00e2n\u0103 \u00een 2026 de la 25 MW.\u201c Attila Steiner, secretar de stat pentru energie \u015fi politici de mediu \u00een cadrul Ministerului Energiei, Ungaria<\/p>\n<p>\n\u201eIndustria \u015fi-a pierdut focusul. Tat\u0103l meu are peste 80 de ani \u015fi niciodat\u0103 nu \u015fi-a citit factura. Asta p\u00e2n\u0103 acum. Porne\u015fte \u015fi opre\u015fte radiatorul pentru a putea face economii. Politicienii europeni ar trebui s\u0103 se concentreze mai mult pe cet\u0103\u0163enii lor, nu s\u0103 lupte pentru al\u0163ii. Trebuie s\u0103 ne concentr\u0103m mai mult pe unitate.\u201c K\u00e1roly M\u00e1trai, CEO, MVM Group, Ungaria<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Eurelectric este cea mai puternic\u0103 organiza\u0163ie euro\u00adpean\u0103 dedicat\u0103 sus\u00ad\u0163i\u00adnerii intereselor in\u00addustriei energetice, care reune\u015fte mai bine de 3.500 de compa\u00adnii din domeniului utilit\u0103\u0163ilor \u015fi al producerii de energie.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[510],"tags":[23043,9817,150,57843,57844,9694,528,7823],"class_list":["post-227030","post","type-post","status-publish","format-standard","hentry","category-actualitate","tag-atena","tag-consum","tag-energie","tag-eurelectric","tag-eurelectric-power-summit","tag-tranzitie","tag-uniunea-europeana","tag-utilitati"],"_links":{"self":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/227030","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=227030"}],"version-history":[{"count":0,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/227030\/revisions"}],"wp:attachment":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=227030"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=227030"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=227030"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}