{"id":225552,"date":"2024-04-03T15:39:22","date_gmt":"2024-04-03T15:39:22","guid":{"rendered":"https:\/\/bm.dev.synology.me\/?p=225552"},"modified":"2024-04-03T15:39:22","modified_gmt":"2024-04-03T15:39:22","slug":"comisia-europeana-a-lansat-doua-investigatii-asupra-unei-proceduri-de-achizitie-publica-pentru-un-parc-fotovoltaic-din-romania-dezvoltat-de-ce-oltenia-si-omv-petrom-si-finantat-partial-din-fonduri-eu","status":"publish","type":"post","link":"https:\/\/bm.dev.synology.me\/?p=225552","title":{"rendered":"Comisia European\u0103 a lansat dou\u0103 investiga\u0163ii asupra unei proceduri de achizitie public\u0103 pentru un parc fotovoltaic din Rom\u00e2nia, dezvoltat de CE Oltenia \u015fi OMV Petrom \u015fi finantat partial din fonduri europene"},"content":{"rendered":"<p style=\"text-align: justify;\">\n<span>Comisia European\u0103 a lansat miercuri dou\u0103 investiga\u0163ii \u00een baza Regulamentului privind subven\u0163iile str\u0103ine (<\/span><a>Foreign Subsidies Regulation<\/a>)<span> legate de <\/span><span>un parc fotovoltaic din Rom\u00e2nia, finantat partial din Fondul UE de Modernizare<\/span><\/p>\n<p style=\"text-align: justify;\">\n<span>I<\/span>nvestiga\u0163iile evalueaz\u0103 posibila distorsionare a pie\u0163ei al subven\u0163iilor str\u0103ine acordate ofertan\u0163ilor \u00een cadrul unei proceduri de achizi\u0163ie public\u0103. Comisia va evalua dac\u0103 operatorii economici \u00een cauz\u0103 au beneficiat de un avantaj neconcurential pentru a ob\u0163ine contracte publice pe teritoriul UE.<\/p>\n<p style=\"text-align: justify;\">\nComisia European\u0103 s-a sesizat \u00een urma notific\u0103rilor depuse, pe de o parte, de ENEVO Group, inclusiv LONGi Solar Technologie GmbH, \u015fi, pe de alt\u0103 parte, de Shanghai Electric UK Co. Ltd. \u015fi Shanghai Electric Hong Kong International Engineering.<\/p>\n<p style=\"text-align: justify;\">\nLicitatia vizat\u0103 a fost lansat\u0103 de o autoritate contractant\u0103 din Rom\u00e2nia (societatea PARC FOTOVOLTAIC ROVINARI EST) pentru proiectarea, construirea \u015fi exploatarea unui parc fotovoltaic cu o putere instalat\u0103 de 110 MW.<\/p>\n<p style=\"text-align: justify;\">\nSocietatea Parc Fotovoltaic Rovinari Est este detinut\u0103 de OMV Petrom \u015fi Complexul Energetic Oltenia, av\u00e2nd \u00een plan constructia a patru parcuri fotovoltaice, la Rovinari, I\u015falnita \u015fi TIsmana. Valoarea estimat\u0103 a contractului este de 374 de milioane de euro. 70% din investi\u0163ie este finan\u0163at\u0103 din Fondul pentru Modernizare al UE.<\/p>\n<p style=\"text-align: justify;\">\n\u00cen conformitate cu Regulamentul privind subven\u0163iile str\u0103ine, companiile sunt obligate s\u0103 notifice licita\u0163iile pentru achizi\u0163ii publice \u00een UE \u00een cazul \u00een care valoarea estimat\u0103 a contractului dep\u0103\u015fe\u015fte 250 de milioane euro \u015fi compania a beneficiat de contribu\u0163ii financiare str\u0103ine de cel pu\u0163in 4 milioane euro din partea a cel pu\u0163in o \u0163ar\u0103 ter\u0163\u0103 \u00een cei trei ani anteriori notific\u0103rii.<\/p>\n<p>\u00cen urma examin\u0103rii preliminare a notific\u0103rilor, Comisia a considerat c\u0103 este justificat\u0103 deschiderea unei anchete aprofundate pentru cei doi participanti la procedura de achizitie, deoarece exist\u0103 suficiente indicii c\u0103 ambilor li s-au acordat subven\u0163ii str\u0103ine care denatureaz\u0103 pia\u0163a intern\u0103.<\/p>\n<p style=\"text-align: justify;\">\n<span>Cele dou\u0103 consor\u0163ii au transmis notific\u0103rile pe 4 martie 2024. Comisia European\u0103 are la dispozi\u0163ie 110 zile lucr\u0103toare de la data respectiv\u0103 pentru a lua o decizie.<\/span><\/p>\n<p -webkit-text-stroke-width:=\"\" 0px=\"\" 5px=\"\" background-color:=\"\" box-sizing:=\"\" color:=\"\" font-family:=\"\" font-size:=\"\" font-style:=\"\" font-variant-caps:=\"\" font-variant-ligatures:=\"\" font-weight:=\"\" helvetica=\"\" letter-spacing:=\"\" line-height:=\"\" margin:=\"\" max-width:=\"\" orphans:=\"\" outline:=\"\" sans=\"\" source=\"\" style=\"text-align: justify;\" text-align:=\"\" text-decoration-color:=\"\" text-decoration-style:=\"\" text-decoration-thickness:=\"\" text-indent:=\"\" text-transform:=\"\" white-space:=\"\" widows:=\"\" word-spacing:=\"\">\nPrimul consor\u0163iu investigat este compus din grupul ENEVO \u015fi LONGi Solar Technologie GmbH. Enevo Group, liderul consor\u0163iului, este un furnizor de servicii de inginerie \u015fi consultan\u0163\u0103 cu sediul \u00een Rom\u00e2nia. Longi Solar Technologie este o filial\u0103 german\u0103 nou \u00eenfiin\u0163at\u0103, de\u0163inut\u0103 integral de LONGi Green Energy Technology, furnizor de solu\u0163ii solare fotovoltaice, cotat la Bursa din Hong Kong. At\u00e2t LONGi Solar Technologie, c\u00e2t \u015fi LONGi Green Energy Technology \u00ee\u015fi desf\u0103\u015foar\u0103 activitatea \u00een domeniul dezvolt\u0103rii, fabric\u0103rii \u015fi \u00eentre\u0163inerii plachetelor, celulelor \u015fi modulelor solare.<\/p>\n<p -webkit-text-stroke-width:=\"\" 0px=\"\" 5px=\"\" background-color:=\"\" box-sizing:=\"\" color:=\"\" font-family:=\"\" font-size:=\"\" font-style:=\"\" font-variant-caps:=\"\" font-variant-ligatures:=\"\" font-weight:=\"\" helvetica=\"\" letter-spacing:=\"\" line-height:=\"\" margin:=\"\" max-width:=\"\" orphans:=\"\" outline:=\"\" sans=\"\" source=\"\" style=\"text-align: justify;\" text-align:=\"\" text-decoration-color:=\"\" text-decoration-style:=\"\" text-decoration-thickness:=\"\" text-indent:=\"\" text-transform:=\"\" white-space:=\"\" widows:=\"\" word-spacing:=\"\">\nAl doilea consor\u0163iu investigat este compus din Shanghai Electric UK Co. Ltd. \u015fi Shanghai Electric Hong Kong International Engineering Co. Ltd. Ambele societ\u0103\u0163i sunt de\u0163inute integral de Shanghai Electric Group, companie de\u0163inut\u0103 de statul chinez. Shanghai Electric UK Co., Ltd. \u015fi Shanghai Electric Hong Kong International Engineering Co., Ltd. sunt principalii furnizori mondiali de solu\u0163ii industriale \u00een domeniul energiei, al produc\u0163iei \u015fi al integr\u0103rii inteligen\u0163ei digitale. Acestea furnizeaz\u0103 servicii privind stocarea energiei eoliene, solare \u015fi a hidrogenului, precum \u015fi un proces integrat de generare, re\u0163ea, \u00eenc\u0103rcare \u015fi stocare.<\/p>\n<p style=\"text-align: justify;\">\n&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Comisia European\u0103 a lansat miercuri dou\u0103 investiga\u0163ii \u00een baza Regulamentului privind subven\u0163iile str\u0103ine (Foreign Subsidies Regulation) legate de un parc fotovoltaic din Rom\u00e2nia, finantat partial din Fondul UE de Modernizare Investiga\u0163iile evalueaz\u0103 posibila distorsionare a pie\u0163ei al subven\u0163iilor str\u0103ine acordate ofertan\u0163ilor \u00een cadrul unei proceduri de achizi\u0163ie public\u0103. Comisia va evalua dac\u0103 operatorii economici \u00een [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[510],"tags":[9870,18563,20154,8556],"class_list":["post-225552","post","type-post","status-publish","format-standard","hentry","category-actualitate","tag-parc","tag-shanghai","tag-solar","tag-subventii"],"_links":{"self":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/225552","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=225552"}],"version-history":[{"count":0,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/225552\/revisions"}],"wp:attachment":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=225552"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=225552"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=225552"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}