{"id":212730,"date":"2023-02-02T19:15:08","date_gmt":"2023-02-02T19:15:08","guid":{"rendered":"https:\/\/bm.dev.synology.me\/?p=212730"},"modified":"2026-04-09T13:17:29","modified_gmt":"2026-04-09T13:17:29","slug":"tribunalul-bucuresti-a-decis-elcen-principalul-furnizor-de-energie-termica-al-capitalei-iese-din-insolventa","status":"publish","type":"post","link":"https:\/\/bm.dev.synology.me\/?p=212730","title":{"rendered":"Tribunalul Bucure\u015fti a decis: ELCEN, principalul furnizor de energie termic\u0103 al Capitalei, iese din insolven\u0163\u0103"},"content":{"rendered":"<p>\nElectrocentrale Bucure\u015fti SA (ELCEN), principalul furnizor de agent termic pentru sistemul de alimentare centralizat\u0103 cu energie termic\u0103 din Bucure\u015fti, anun\u0163\u0103 c\u0103 Tribunalul Bucure\u015fti a decis joi \u00eenchiderea procedurii de insolven\u0163\u0103 \u015fi reintroducerea ELCEN \u00een circuitul economic.<\/p>\n<p>\nCererea prin care Electrocentrale Bucure\u015fti SA a solicitat deschiderea procedurii de insolven\u0163\u0103 a fost admis\u0103 \u00een 6 octombrie 2016, la Tribunalul Bucure\u015fti.<\/p>\n<p>\nELCEN a acoperit \u00een totalitate crean\u0163ele datorate.<\/p>\n<p>\n\u201e\u00cenchiderea procedurii de reorganizare judiciar\u0103 \u015fi, implicit, a procedurii de insolven\u0163\u0103 prevede stingerea tuturor obliga\u0163iilor de plat\u0103 asumate prin planul de reorganizare \u015fi a crean\u0163elor curente scadente. Drept urmare, Tribunalul Bucure\u015fti a decis ast\u0103zi, 02 februarie 2023, reintroducerea ELCEN \u00een circuitul economic\u201d, transmite compania.<\/p>\n<p>\nPotrivit unui comunicat de pres\u0103, ie\u015firea din dificultate financiar\u0103 deschide calea ELCEN pentru a accesa fonduri europene nerambursabile sau surse de finan\u0163are puse la dispozi\u0163ie de institu\u0163ii financiare na\u0163ionale \u015fi interna\u0163ionale, pentru a-\u015fi eficientiza CET-urile pe care le de\u0163ine.<\/p>\n<p>\n\u201e\u00cen urm\u0103toarea perioad\u0103, ELCEN se va concentra preponderent pe implementarea proiectelor majore de investi\u0163ii, \u015fi anume construirea unor centrale termoelectrice noi \u00een cogenerare de \u00eenalt\u0103 eficien\u0163\u0103, cum ar fi implementarea unei unit\u0103\u0163i de cogenerare de \u00eenalt\u0103 eficien\u0163\u0103 \u00een cadrul CET Bucure\u015fti Sud. Studiul de Fezabilitate pentru aceast\u0103 investi\u0163ie a fost finalizat. Solu\u0163ia optim\u0103 \u00een SF prevede realizarea unei capacit\u0103\u0163i noi de produc\u0163ie \u00een cogenerare de \u00eenalt\u0103 eficien\u0163\u0103, \u00een incinta CET Bucure\u015fti Sud, cu o putere electric\u0103 brut\u0103 de cca. 600 MWe \u015fi energie termic\u0103 livrat\u0103 de cca. 376 Gcal\/h ce va utiliza gaz natural, ulterior \u00een amestec cu hidrogen. Prin compara\u0163ie, puterea electric\u0103 instalat\u0103 \u00een prezent \u00een cele 4 CET-uri ale ELCEN este de 586,25 MW. \u0162in\u00e2nd cont de estim\u0103rile Dispecerului Energetic Na\u0163ional care avertizeaz\u0103 c\u0103 deficitul de energie electric\u0103 din produc\u0163ia intern\u0103 pentru acoperirea consumului va cre\u015fte masiv mai ales \u00een condi\u0163ii de iarn\u0103, \u00een orele de v\u00e2rf de sarcin\u0103, punerea \u00een func\u0163iune a unei centrale noi, moderne, cu o putere electric\u0103 de 600 MWe reprezint\u0103 o contribu\u0163ie major\u0103 la men\u0163inerea siguran\u0163ei \u00een alimentarea cu energie electric\u0103. Totodat\u0103, cantitatea de 376 Gcal\/h livrat\u0103 din noua central\u0103 va acoperi f\u0103r\u0103 probleme necesarul de agent termic pentru alimentarea cu ap\u0103 cald\u0103 \u015fi c\u0103ldur\u0103 a consumatorilor aronda\u0163i acestei centrale\u201d, se men\u0163ioneaz\u0103 \u00een comuunicat.<\/p>\n<p>\nConform sursei citate, centrala va dispune de echipamente noi, performante, care vor putea asigura energia termica \u015fi electric\u0103 cu o eficien\u0163\u0103 global\u0103 de aprox. 86-90% \u015fi reduceri semnificative a emisiilor.<\/p>\n<p>\nDe asemenea, Elcen \u00ee\u015fi propune s\u0103 eficientizeze activitatea din CET Groz\u0103ve\u015fti, s\u0103 implementeze unele capacit\u0103\u0163i de cogenerare de \u00eenalt\u0103 eficien\u0163\u0103 utiliz\u00e2nd motoare termice \u00een cadrul CET Progresu\u015fi s\u0103 modernizeze capacit\u0103\u0163ile existente \/ retehnologizarea unor capacit\u0103\u0163i de producere a energiei termice \u00een regim de v\u00e2rf \u00een CET Groz\u0103ve\u015fti, CET Bucure\u015fti Sud \u015fi CET Bucure\u015fti Vest.<\/p>\n<p>\n\u201eIe\u015firea din insolven\u0163\u0103 permite ELCEN punerea \u00een aplicare a unei strategii de dezvoltare care s\u0103 asigure suportul la nivel local, na\u0163ional \u015fi european prin implementarea rapid\u0103 \u015fi eficient\u0103 a tehnologiilor adecvate, corelate cu cerin\u0163ele de mediu \u015fi cu noua realitate geopolitic\u0103 de pe pia\u0163a energiei\u201d, se men\u0163ioneaz\u0103 \u00een finalul comunicatului.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Electrocentrale Bucure\u015fti SA (ELCEN), principalul furnizor de agent termic pentru sistemul de alimentare centralizat\u0103 cu energie termic\u0103 din Bucure\u015fti, anun\u0163\u0103 c\u0103 Tribunalul Bucure\u015fti a decis joi \u00eenchiderea procedurii de insolven\u0163\u0103 \u015fi reintroducerea ELCEN \u00een circuitul economic. Cererea prin care Electrocentrale Bucure\u015fti SA a solicitat deschiderea procedurii de insolven\u0163\u0103 a fost admis\u0103 \u00een 6 octombrie 2016, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[510],"tags":[306,10353,9008],"class_list":["post-212730","post","type-post","status-publish","format-standard","hentry","category-actualitate","tag-bucuresti","tag-elcen","tag-insolventa"],"_links":{"self":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/212730","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=212730"}],"version-history":[{"count":1,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/212730\/revisions"}],"predecessor-version":[{"id":212744,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/212730\/revisions\/212744"}],"wp:attachment":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=212730"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=212730"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=212730"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}