{"id":211848,"date":"2023-01-06T16:14:42","date_gmt":"2023-01-06T16:14:42","guid":{"rendered":"https:\/\/bm.dev.synology.me\/?p=211848"},"modified":"2023-01-06T16:14:42","modified_gmt":"2023-01-06T16:14:42","slug":"n-dan-am-mai-facut-un-pas-pentru-modernizarea-si-extinderea-sistemului-de-semaforizare-inteligenta","status":"publish","type":"post","link":"https:\/\/bm.dev.synology.me\/?p=211848","title":{"rendered":"N. Dan: Am mai f\u0103cut un pas pentru modernizarea \u015fi extinderea Sistemului de Semaforizare Inteligent\u0103"},"content":{"rendered":"<p>\n\u201eAm mai f\u0103cut un pas \u00een procesul de modernizare \u015fi extindere a Sistemului de Semaforizare Inteligent\u0103 din Capital\u0103 (BTMS). A fost aprobat\u0103 cererea de finan\u0163are, prin PNRR, \u00een valoare de 1 milion de euro, pentru etapele a doua \u015fi a treia ale acestui proiect. Aceast\u0103 sum\u0103 se adaug\u0103 celor 11,5 milioane de euro ob\u0163inute anul trecut \u00eempreun\u0103 cu prim\u0103riile de sector pentru prima etap\u0103, cea care vizeaz\u0103 modernizarea \u015fi reconfigurarea a 85 de intersec\u0163ii\u201d, trabnsmite Nicu\u015for Dan.<\/p>\n<p>\nCea de a doua etap\u0103, potrivit primarului general al Capitalei, presupune moderniz\u0103ri aferente Centrului de trafic existent, software \u015fi hardware, iar cea de a treia &#8211; modernizarea a aproximativ 185 de intersec\u0163ii existente, incluse \u00een sistemul actual BTMS, dar aflate \u00een diverse stadii de degradare.<\/p>\n<p>\n\u201e\u00cen a patra etap\u0103 vor fi reabilitate\/modernizate 194 intersec\u0163ii semaforizate existente \u015fi incluse \u00een sistemul actual BTMS, la care se vor ad\u0103uga 80 de intersec\u0163ii sau treceri de pietoni, nesemaforizate, dar care necesit\u0103 semaforizare \u015fi includere \u00een BTMS\u201d, \u00eencheie Nicu\u015for Dan.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nicu\u015for Dan anun\u0163\u0103 c\u0103 a fost aprobat\u0103 cererea de finan\u0163are, prin PNRR, \u00een valoare de 1 milion de euro, pentru etapele a doua \u015fi a treia ale procesului de modernizare \u015fi extindere a Sistemului de Semaforizare Inteligent\u0103 din Capital\u0103 (BTMS).<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[510],"tags":[28120,53669],"class_list":["post-211848","post","type-post","status-publish","format-standard","hentry","category-actualitate","tag-nicusor-dan","tag-semaforizare"],"_links":{"self":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/211848","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=211848"}],"version-history":[{"count":0,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/211848\/revisions"}],"wp:attachment":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=211848"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=211848"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=211848"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}