{"id":197855,"date":"2021-10-05T10:14:23","date_gmt":"2021-10-05T10:14:23","guid":{"rendered":"https:\/\/bm.dev.synology.me\/?p=197855"},"modified":"2021-10-05T10:14:23","modified_gmt":"2021-10-05T10:14:23","slug":"db-schenker-divizia-de-logistica-a-gigantului-deutsche-bahn-deschide-un-terminal-de-2-330-mp-in-parcul-industrial-tetarom-iii-din-cluj-napoca-al-doilea-ca-marime-dupa-cel-operat-de-companie-in-bucu","status":"publish","type":"post","link":"https:\/\/bm.dev.synology.me\/?p=197855","title":{"rendered":"DB Schenker, divizia de logistic\u0103 a gigantului Deutsche Bahn, deschide un terminal de 2.330 mp \u00een parcul industrial Tetarom III din Cluj-Napoca, al doilea ca m\u0103rime dup\u0103 cel operat de companie \u00een Bucure\u015fti"},"content":{"rendered":"<p>\nDB Schenker, furnizor global de servicii de transport \u015fi logistic\u0103, urmeaz\u0103 s\u0103 deschid\u0103 la \u00eenceputul anului 2022 un nou terminal de cross-dock (desc\u0103rcare \u015fi \u00eenc\u0103rcare f\u0103r\u0103 depozitare \u2013 n. red.), \u00een parcul industrial Tetarom III, Jucu-Herghelie, situat la 15 km de Cluj-Napoca.<\/p>\n<p>\nCu o suprafa\u0163\u0103 total\u0103 de aproximativ 2.330 metri p\u0103tra\u0163i, terminalul este destinat opera\u0163iunilor de cross-docking, dar include \u015fi spa\u0163ii de birouri. El vine \u00een completarea celui deja existent, \u00een suprafa\u0163\u0103 total\u0103 de aproximativ 7.000 metri p\u0103tra\u0163i, destinat opera\u0163iunilor logistice \u015fi de depozitare, \u015fi este al doilea terminal de cross-dock al companiei ca m\u0103rime, dup\u0103 cel din Bolintin-Deal, Bucure\u015fti.<\/p>\n<p>\n\u201cNoul terminal are ca scop optimizarea serviciilor oferite clien\u0163ilor companiei, prin reducerea timpilor de tranzit \u015fi cre\u015fterea flexibilit\u0103\u0163ii \u00een distribu\u0163ia na\u0163ional\u0103\u201d, spun reprezentan\u0163ii companiei.<\/p>\n<p>\nLocalizat \u00een parcul industrial TRC Park Cluj, un proiect dezvoltat de c\u0103tre Transilvania Construc\u0163ii, noul terminal va include spa\u0163ii \u015fi birouri Clasa A, locuri de parcare pentru camioane, sta\u0163ie de \u00eenc\u0103rcare pentru ma\u015fini electrice, securitate 24\/7 cu sistem de camere de supraveghere, iluminat LED, sistem HVAC.<\/p>\n<p>\n\u201cCluj-Napoca r\u0103m\u00e2ne un punct strategic pentru activitatea companiei noastre, iar prin relocarea activit\u0103\u0163ilor noastre \u00een acest nou terminal, dezvoltat la cele mai \u00eenalte standarde de calitate, vom r\u0103spunde \u015fi mai eficient nevoilor de logistic\u0103 \u015fi transport ale partenerilor no\u015ftri existen\u0163i \u015fi viitori\u201d, spune Albin Budinsky, CEO, DB Schenker \u00een Rom\u00e2nia.<\/p>\n<p>\nDB Schenker este un furnizor global de servicii logistice \u015fi de transport, cu peste 74,200 de angaja\u0163i \u00een 2,100 de loca\u0163ii \u015fi 130 de \u0163\u0103ri.<\/p>\n<p>\n\u00cen Rom\u00e2nia, compania de\u0163ine 6 spa\u0163ii logistice (Bucure\u015fti, Arad, Constan\u0163a, Craiova, Giurgiu, Cluj-Napoca), iar suprafa\u0163a total\u0103 ocupat\u0103 este de aproximativ 60.000 mp.<\/p>\n<p>\nDB Schenker, divizia logistic\u0103 a gigantului Deutsche Bahn are \u00een plan cre\u015fterea volumelor derulate \u00een portul Constan\u0163a. Principalele opera\u0163iuni desf\u0103\u015furate de DB Schenker \u00een terminalul din portul Constan\u0163a sunt reprezentate de desc\u0103rc\u0103ri \u015fi \u00eenc\u0103rc\u0103ri nave, barje, vagoane, containere, servicii logistice, formalit\u0103\u0163i vamale, transport rutier din \u015fi spre portul Constan\u0163a \u015fi Agigea (containerizat, prelat\u0103 etc.); transport feroviar. Platforma DB Schenker din portul Constan\u0163a este tranzitat\u0103 de circa 900.000 de tone anual, reprezent\u00e2nd marf\u0103 de import, export \u015fi tranzit.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>DB Schenker, furnizor global de servicii de transport \u015fi logistic\u0103, urmeaz\u0103 s\u0103 deschid\u0103 la \u00eenceputul anului 2022 un nou terminal de cross-dock (desc\u0103rcare \u015fi \u00eenc\u0103rcare f\u0103r\u0103 depozitare \u2013 n. red.), \u00een parcul industrial Tetarom III, Jucu-Herghelie, situat la 15 km de Cluj-Napoca.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[510],"tags":[306,9597,35881,8521,13647],"class_list":["post-197855","post","type-post","status-publish","format-standard","hentry","category-actualitate","tag-bucuresti","tag-cluj-napoca","tag-db-schenker","tag-logistica","tag-terminal"],"_links":{"self":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/197855","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=197855"}],"version-history":[{"count":0,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/197855\/revisions"}],"wp:attachment":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=197855"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=197855"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=197855"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}