{"id":196216,"date":"2021-08-05T17:36:53","date_gmt":"2021-08-05T17:36:53","guid":{"rendered":"https:\/\/bm.dev.synology.me\/?p=196216"},"modified":"2021-08-05T17:36:53","modified_gmt":"2021-08-05T17:36:53","slug":"transelectrica-pune-pe-masa-20-de-proiecte-pentru-reconfigurarea-retelei-electrice-de-transport-care-sa-asigure-trecerea-graduala-la-o-economie-neutra-din-punct-de-vedere-al-emisiilor-de-carbon","status":"publish","type":"post","link":"https:\/\/bm.dev.synology.me\/?p=196216","title":{"rendered":"Transelectrica pune pe mas\u0103 20 de proiecte pentru reconfigurarea re\u0163elei electrice de transport, care s\u0103 asigure trecerea gradual\u0103 la o economie neutr\u0103 din punct de vedere al emisiilor de carbon"},"content":{"rendered":"<p>\nTranselectrica (simbol bursier TEL), compania na\u0163ional\u0103 de transport al energiei electrice, a alc\u0103tuit o list\u0103 care cuprinde minimum 20 de proiecte strategice ce vor permite flexibilizarea Re\u0163elei Electrice de Transport, \u00een scopul asigur\u0103rii trecerii graduale la o economie neutr\u0103 din punct de vedere al emisiilor de carbon.<\/p>\n<p>\n\u201cPentru a ob\u0163ine o reconfigurare a sistemului energetic \u015fi a re\u0163elei de transport al energiei electrice \u00een acord cu noile direc\u0163ii stabilite prin pachetele legislative europene Green Deal \u015fi Fit for 55, \u0163intele de realizare a planurilor de investi\u0163ii implementate de CNTEE Transelectrica trebuie s\u0103 le dep\u0103\u015feasc\u0103 pe cele planificate deja\u201d, spun reprezentan\u0163ii companiei.<\/p>\n<p>\nTranzi\u0163ia energetic\u0103 impune o adaptare rapid\u0103 a re\u0163elei electrice de transport \u015fi intensificarea ritmului de extindere a acesteia prev\u0103zut \u00een Planul de Dezvoltare a RET 2020 \u2013 2029.&nbsp; \u00cen acest context, guvernul Rom\u00e2niei a aprobat recent, la propunerea Secretariatului General al Guvernului \u2013 autoritatea public\u0103 tutelar\u0103 a CNTEE Transelectrica SA, un memorandum cuprinz\u00e2nd un plan de ac\u0163iuni al companiei care prevede realizarea unor proiecte investi\u0163ionale esen\u0163iale pentru consolidarea re\u0163elei electrice de transport.<\/p>\n<p>\n\u00cen plus, \u00een ultima perioad\u0103 au fost organizate mai multe \u00eent\u00e2lniri \u00eentre reprezentan\u0163i ai secretariatului general al guvernului, ministerului Energiei \u015fi ai CNTEE Transelectrica, dicu\u0163iile conduc\u00e2nd la concluzia comun\u0103 privind necesitatea simplific\u0103rii procesului de implementare a unor proiecte de importan\u0163\u0103 na\u0163ional\u0103 \u00een domeniul energiei electrice.<\/p>\n<p>\n\u00cen consecin\u0163\u0103, Transelectrica a elaborat o list\u0103 deschis\u0103 de proiecte strategice, unele dintre ele aflate deja \u00een derulare, pentru care este necesar\u0103 accelerarea ritmului de implementare.<\/p>\n<p>\nPrincipalele proiecte propuse de Transelectrica sunt:<\/p>\n<p>\n\u25ba Linia Electric\u0103 Aerian\u0103 (LEA) 400 kV Por\u0163ile de Fier \u2013 Re\u015fi\u0163a;<\/p>\n<p>\n\u25ba LEA 400 kV dublu circuit Re\u015fi\u0163a \u2013 Timi\u015foara \u2013 S\u0103c\u0103laz \u2013 Arad<\/p>\n<p>\n\u25ba LEA 400 kV dublu circuit Cernavod\u0103 \u2013 St\u00e2lpu, cu un circuit de intrare \/ ie\u015fitre \u00een Sta\u0163ia Gura Ialomi\u0163ei<\/p>\n<p>\n\u25ba LEA 400 kV dublu circuit Sm\u00e2rdan \u2013 Gutina\u015f<\/p>\n<p>\n\u25ba LEA 400 kV G\u0103d\u0103lin \u2013 Suceava<\/p>\n<p>\n\u25ba LEA 400 kV Suceava \u2013 B\u0103l\u0163i (Republica Moldova);<\/p>\n<p>\n\u25ba LEA 400 kV Medgidia Sud \u2013 Constan\u0163a Nord<\/p>\n<p>\n\u25ba LEA 400 kV Isaccea \u2013 Tulcea Vest<\/p>\n<p style=\"margin-left:.25in;\">\n\u25ba Linia Electric\u0103 Subteran\u0103 (LES) Bucure\u015fti Sud \u2013 Groz\u0103ve\u015fti<\/p>\n<p style=\"margin-left:.25in;\">\n\u25ba LES 400 kV Domne\u015fti \u2013 Groz\u0103ve\u015fti<\/p>\n<p style=\"margin-left:.25in;\">\n\u25ba Sta\u0163ia 400\/110 kV Groz\u0103ve\u015fti<\/p>\n<p style=\"margin-left:.25in;\">\n\u25ba\u00cenchiderea Inelului de 400 kV Bucure\u015fti \u2013 Ilfov, \u00een zona de est;<\/p>\n<p style=\"margin-left:.25in;\">\n\u25ba Reconductorarea LEA 400 kV Bucure\u015fti Sud \u2013 Gura Ialomi\u0163ei;<\/p>\n<p style=\"margin-left:.25in;\">\n\u25ba Reconductorarea Axului 400 kV Bucure\u015fti Sud \u2013 Pelicanu \u2013 Cernavod\u0103;<\/p>\n<p style=\"margin-left:.25in;\">\n\u25ba Reconductorarea Axului 220 kV Gutina\u015f \u2013 Dumbrava \u2013 Stejaru \u2013 Gheorgheni \u2013 F\u00e2nt\u00e2nele \u2013 Ungheni;&nbsp;<\/p>\n<p style=\"margin-left:.25in;\">\n\u25ba Reconductorarea Axului 220 kV Ureche\u015fti \u2013 T\u00e2rgu Jiu Nord \u2013 Paro\u015feni \u2013 Baru Mare \u2013 H\u0103\u015fdat;&nbsp;<\/p>\n<p style=\"margin-left:.25in;\">\n\u25ba Reconductorarea LEA 220 kV Por\u0163ile de Fier \u2013 Re\u015fi\u0163a circuitele 1 \u015fi 2;&nbsp;<\/p>\n<p style=\"margin-left:.25in;\">\n\u25baTrecerea la tensiunea de 400 kV a Axului 220 kV Brazi Vest \u2013 Teleajen \u2013 St\u00e2lpu \u015fi reconductorarea acestuia;&nbsp;<\/p>\n<p style=\"margin-left:.25in;\">\n\u25ba LEA 400 kV St\u00e2lpu \u2013 Bra\u015fov;&nbsp;<\/p>\n<p style=\"margin-left:.25in;\">\n\u25ba Linii noi de curent alternativ \u015fi de curent continuu de evacuare a produc\u0163iei eoliene on-shore \u015fi off-shore din zona Dobrogea, respectiv a produc\u0163iei generate de Unitatea 3 \u015fi de Unitatea 4 ale Centralei Electrice Nucleare de la Cernavod\u0103, pe traseul Tuzla \u2013 Podi\u015for \u015fi Podi\u015for \u2013 Corbu \u2013 Hurezani \u2013 Ha\u0163eg \u2013 Reca\u015f \u2013 Horia \u2013 N\u0103dlac.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Transelectrica (simbol bursier TEL), compania na\u0163ional\u0103 de transport al energiei electrice, a alc\u0103tuit o list\u0103 care cuprinde minimum 20 de proiecte strategice ce vor permite flexibilizarea Re\u0163elei Electrice de Transport, \u00een scopul asigur\u0103rii trecerii graduale la o economie neutr\u0103 din punct de vedere al emisiilor de carbon.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[510],"tags":[7467,77,7543,4683,32958],"class_list":["post-196216","post","type-post","status-publish","format-standard","hentry","category-actualitate","tag-asigurare","tag-proiecte","tag-retea","tag-transelectrica","tag-trecere"],"_links":{"self":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/196216","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=196216"}],"version-history":[{"count":0,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/196216\/revisions"}],"wp:attachment":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=196216"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=196216"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=196216"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}