{"id":188864,"date":"2020-12-10T11:42:54","date_gmt":"2020-12-10T11:42:54","guid":{"rendered":"https:\/\/bm.dev.synology.me\/?p=188864"},"modified":"2020-12-10T11:42:54","modified_gmt":"2020-12-10T11:42:54","slug":"e-on-energie-a-finalizat-instalarea-celor-19-statii-de-incarcare-rapida-a-masinilor-electrice","status":"publish","type":"post","link":"https:\/\/bm.dev.synology.me\/?p=188864","title":{"rendered":"E.ON Energie a finalizat instalarea celor 19 sta\u0163ii de \u00eenc\u0103rcare rapid\u0103 a ma\u015finilor electrice"},"content":{"rendered":"<p>\n\u201eE.ON Energie Rom\u00e2nia a pus \u00een func\u0163iune ultima sta\u0163ie de \u00eenc\u0103rcare rapid\u0103 a autovehiculelor electrice dintre cele 19 pe care s-a angajat s\u0103 le instaleze \u00een cadrul proiectului NEXT-E, aceasta fiind amplasat\u0103 \u00een municipiul Lugoj, jud. Timi\u015f. (&#8230;) Sta\u0163ia de \u00eenc\u0103rcare de la Lugoj are o putere maxim\u0103 de 77 kW \u015fi este de tip fast charge 1&#215;50 kW (curent continuu conectori CCS sau CHAdeMO) + 1&#215;22 kW (curent alternativ conector Type 2), cu 2 locuri de parcare. Astfel, timpul mediu de \u00eenc\u0103rcare a unei ma\u015fini electrice va fi de aproximativ 40 de minute pentru 80% din baterie. Ini\u0163iativa face parte din proiectul NEXT-E, cofinan\u0163at din fonduri europene prin intermediul programului Connecting Europe Facility (CEF) prin care E.ON Energie Rom\u00e2nia \u015fi-a propus s\u0103 instaleze 19 unit\u0103\u0163i de \u00eenc\u0103rcare rapid\u0103 a autovehiculelor, alte 21 revenind MOL, unul dintre partenerii din acest proiect\u201d, anun\u0163\u0103 E. ON Energie Rom\u00e2nia.<\/p>\n<p>\nPotrivit sursei citate, p\u00e2n\u0103 \u00een prezent, prin intermediul sta\u0163iilor NEXT-E instalate de E.ON Energie Romania, posesorii de autovehicule electrice sau hibrid au utilizat peste 46.000 de kWh de energie electric\u0103 \u015fi au parcurs peste 310.000 de km, impactul asupra mediului fiind o reducere cu 37,2 t de CO2. Cele mai multe \u00eenc\u0103rc\u0103ri s-au f\u0103cut la sta\u0163iile din Ia\u015fi, Suceava \u015fi Roman.<\/p>\n<p>\n\u201eSta\u0163iile sunt integrate \u00eentr-un sistem de monitorizare \u015fi gestionare a sesiunilor de \u00eenc\u0103rcare. Acest sistem asigur\u0103 supravegherea non-stop a respectivei unit\u0103\u0163i \u015fi are posibilitatea de a rezolva de la distan\u0163\u0103 eventualele incidente ap\u0103rute \u00een timpul \u00eenc\u0103rc\u0103rilor. \u00cen plus, eventualele probleme ap\u0103rute la sta\u0163iile de \u00eenc\u0103rcare vor putea fi semnalate telefonic 24\/7 la un call center al E.ON. Utilizatorii de vehicule electrice pot accesa \u015fi rezerva sta\u0163iile direct pe <a href=\"https:\/\/harta-statii.eondrive.ro\/\">https:\/\/harta-statii.eondrive.ro\/<\/a> sau prin aplica\u0163ia mobil\u0103 E.ON Drive, disponibil\u0103 at\u00e2t pentru Android, c\u00e2t \u015fi pentru iOS. De asemenea, acestea pot fi vizualizate pe principalele aplica\u0163ii de transport rutier, dar \u015fi pe platforma online Plugshare\u201d, transmite E.ON.<\/p>\n<p>\nRe\u0163eaua pan-european\u0103 NEXT-E va include 6 \u0163\u0103ri diferite, iar 40 de sta\u0163ii de \u00eenc\u0103rcare electric\u0103 din totalul de 252 din proiectul NEXT-E vor fi instalate \u00een Rom\u00e2nia \u015fi amplasate pe rutele: Suceava-Bac\u0103u-C\u0103l\u0103ra\u015fi, Constan\u0163a-Bucure\u015fti-Timi\u015foara \u015fi Ia\u015fi-T\u00e2rgu Mure\u015f\u2013Alba Iulia. Prin aceast\u0103 ini\u0163iativ\u0103, infrastructura de sta\u0163ii de \u00eenc\u0103rcare pentru autovehicule electrice aferent\u0103 coridoarelor rutiere strategice europene (TEN-T) se va completa cu infrastructura de sta\u0163ii de \u00eenc\u0103rcare pentru autovehicule electrice din Rom\u00e2nia, facilit\u00e2nd transportul rutier cu emisii reduse de CO 2 \u015fi impact redus asupra mediului.<\/p>\n<p>\n\u201ePrin integrarea sta\u0163iilor E.ON Energie Rom\u00e2nia pe platforma interoperabil\u0103 Hubject, orice vehicul electric va putea fi condus f\u0103r\u0103 griji de la grani\u0163a ceh\u0103 la Marea Adriatic\u0103 sau la Marea Neagr\u0103, utiliz\u00e2nd o singur\u0103 aplica\u0163ie. Astfel, utilizatorii \u00ee\u015fi vor putea \u00eenc\u0103rca ma\u015finile \u00een toate sta\u0163iile de \u00eenc\u0103rcare ale proiectului NEXT-E determin\u00e2nd astfel o cre\u015ftere extins\u0103 a mobilit\u0103\u0163ii clien\u0163ilor de e-mobilitate din toate \u0163\u0103rile NEXT-E\u201d, se mai arat\u0103 \u00een comunicat.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>E.ON Energie Rom\u00e2nia a finalizat instalarea celor 19 sta\u0163ii de \u00eenc\u0103rcare rapid\u0103 a ma\u015finilor electrice din cadrul proiectului european NEXT-E, ultima sta\u0163ie fiind pus\u0103 \u00een func\u0163iune \u00een Lugoj.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[510],"tags":[9945,13417,47423],"class_list":["post-188864","post","type-post","status-publish","format-standard","hentry","category-actualitate","tag-e-on","tag-masini-electrice","tag-statii-incarcare"],"_links":{"self":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/188864","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=188864"}],"version-history":[{"count":0,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/188864\/revisions"}],"wp:attachment":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=188864"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=188864"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=188864"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}