{"id":184921,"date":"2020-07-24T10:18:09","date_gmt":"2020-07-24T10:18:09","guid":{"rendered":"https:\/\/bm.dev.synology.me\/?p=184921"},"modified":"2020-07-24T10:18:09","modified_gmt":"2020-07-24T10:18:09","slug":"doi-metri-pe-zi-construiti-in-mandatul-lui-firea-lucrarile-la-largirea-prelungirii-ghencea-ar-putea-fi-gata-in-9-ani","status":"publish","type":"post","link":"https:\/\/bm.dev.synology.me\/?p=184921","title":{"rendered":"Doi metri pe zi, construi\u0163i \u00een mandatul lui Firea. Lucr\u0103rile la l\u0103rgirea Prelungirii Ghencea ar putea fi gata \u00een 9 ani"},"content":{"rendered":"<p>\n<span style=\"font-size: 12px;\">Firea a construit 700 de metri de drum la largirea Prelungirii Ghencea \u00een aproape un an de zile, aproximativ doi metri pe zi<\/span><\/p>\n<p>\nProiectul are \u00een total 6 kilometri \u015fi niciun termen oficial de finalizare. Dac\u0103 lucr\u0103rile continu\u0103 \u00een acela\u015fi ritm, proiectul ar putea fi gata \u00een 9 ani<\/p>\n<p>\nFirea \u0163i-a construit 700 de metri de drum \u00een Prelungirea Ghencea. Mihai F\u0103lan este membru al Ini\u0163iativei Prelungirea Ghencea \u015fi locuie\u015fte \u00een zon\u0103, unde pierde chiar \u015fi o or\u0103 jum\u0103tate la cozile de pe cele dou\u0103 benzi. El crede c\u0103 vei mai avea de a\u015fteptat ani buni p\u00e2n\u0103 s\u0103 scapi de ambuteiaje.<\/p>\n<p>\n\u201eAvem 90% din calea de rulare pentru doar 700 de metri din cei 6 kilometri ai proiectului. Lipsesc \u00een momentul de fa\u0163\u0103 pista de biciclet\u0103, lipsesc trotuarele \u015fi bine\u00een\u0163eles lipse\u015fte linia de tramvai. \u00cen ritmul de lucru de acum, av\u00e2nd \u00een vedere c\u0103 au \u00eenceput lucr\u0103rile acum un an de zile pentru 700 de metri, vor fi terminate undeva \u00een 9 ani de zile\u201d, spune Mihai F\u0103lan, de la Ini\u0163iativa Prelungirea Ghencea.<\/p>\n<p>\n<a href=\"https:\/\/www.mediafax.ro\/\">Cititi mai multe pe www.mediafax.ro<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Firea a construit 700 de metri de drum la largirea Prelungirii Ghencea \u00een aproape un an de zile, aproximativ doi metri pe zi Proiectul are \u00een total 6 kilometri \u015fi niciun termen oficial de finalizare. Dac\u0103 lucr\u0103rile continu\u0103 \u00een acela\u015fi ritm, proiectul ar putea fi gata \u00een 9 ani Firea \u0163i-a construit 700 de metri [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[510],"tags":[314,23045,16124],"class_list":["post-184921","post","type-post","status-publish","format-standard","hentry","category-actualitate","tag-construire","tag-ghencea","tag-prelungire"],"_links":{"self":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/184921","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=184921"}],"version-history":[{"count":0,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/184921\/revisions"}],"wp:attachment":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=184921"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=184921"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=184921"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}