{"id":177423,"date":"2019-11-14T12:55:49","date_gmt":"2019-11-14T12:55:49","guid":{"rendered":"https:\/\/bm.dev.synology.me\/?p=177423"},"modified":"2019-11-14T12:55:49","modified_gmt":"2019-11-14T12:55:49","slug":"mariana-miclaus-director-metrorex-magistrala-5-va-fi-gata-in-a-doua-jumatate-a-lui-2020","status":"publish","type":"post","link":"https:\/\/bm.dev.synology.me\/?p=177423","title":{"rendered":"Mariana Micl\u0103u\u015f, director Metrorex: Magistrala 5 va fi gata \u00een a doua jum\u0103tate a lui 2020"},"content":{"rendered":"<p>\nMariana Micl\u0103u\u015f, noul director general al Metrorex, a declarat joi \u00een cadrul inaugur\u0103rii pl\u0103\u0163ii cu cardul contactless la metrou, c\u0103 lucr\u0103rile la Magistrala 5 vor fi finalizate \u00een al doilea semestru al anului viitor, la acest moment acestea fiind realizate 87%.<\/p>\n<p>\n&#8220;Sigur c\u0103 noi ne dorim s\u0103 finaliz\u0103m lucr\u0103rile. Lucr\u0103rile sunt finalizate \u00een propor\u0163ie de 87%, dar mai sunt fronturi neatacate, personal, \u00eempreun\u0103 cu colegii mei voi face o vizit\u0103 pe \u015fantier. O estimare este anul viitor, sf\u00e2r\u015fitul semestrului I, \u00eenceputul semestrului II, sper\u0103m s\u0103 reu\u015fim s\u0103 finaliz\u0103m tot ceea ce s-a \u00eenceput&#8221;, a declarat directorul general.<\/p>\n<p>\nMinistrul Transporturilor, Lucian Bode a declarat la preluarea mandatului, de asemenea, c\u0103 lucr\u0103rile nu vor putea fi terminate \u00een acest an.<\/p>\n<p>\n&#8220;Ne asum\u0103m s\u0103 finaliz\u0103m Magistrala 5 pe tronsonul Drumul Taberei &#8211; Eroilor. (&#8230;) Din p\u0103cate, a\u015fa cum arat\u0103 lucrurile ast\u0103zi, acest obiectiv nu va putea fi recep\u0163ionat \u00een anul 2019&#8221;, a spus Lucian Bode.<\/p>\n<p>\nCiti\u0163i mai multe pe <a href=\"http:\/\/www.mediafax.ro\">www.zf.ro<\/a>.&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mariana Micl\u0103u\u015f, noul director general al Metrorex, a declarat joi \u00een cadrul inaugur\u0103rii pl\u0103\u0163ii cu cardul contactless la metrou, c\u0103 lucr\u0103rile la Magistrala 5 vor fi finalizate \u00een al doilea semestru al anului viitor, la acest moment acestea fiind realizate 87%. &#8220;Sigur c\u0103 noi ne dorim s\u0103 finaliz\u0103m lucr\u0103rile. Lucr\u0103rile sunt finalizate \u00een propor\u0163ie de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[510],"tags":[45557,9394,7683],"class_list":["post-177423","post","type-post","status-publish","format-standard","hentry","category-actualitate","tag-m5","tag-metrorex","tag-metrou"],"_links":{"self":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/177423","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=177423"}],"version-history":[{"count":0,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/177423\/revisions"}],"wp:attachment":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=177423"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=177423"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=177423"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}