{"id":171475,"date":"2019-04-29T12:55:09","date_gmt":"2019-04-29T12:55:09","guid":{"rendered":"https:\/\/bm.dev.synology.me\/?p=171475"},"modified":"2019-04-29T12:55:09","modified_gmt":"2019-04-29T12:55:09","slug":"una-dintre-cele-mai-asteptate-autostrazi-din-romania-intra-in-linie-dreapta","status":"publish","type":"post","link":"https:\/\/bm.dev.synology.me\/?p=171475","title":{"rendered":"Una dintre cele mai a\u015fteptate autostr\u0103zi din Rom\u00e2nia intr\u0103 \u00een linie dreapt\u0103"},"content":{"rendered":"<div>\n\u201eS-a desemnat c\u00e2\u015ftig\u0103torul pentru lotul 1 Boi\u0163a \u2013 Sibiu, parte integrant\u0103 a autostr\u0103zii Pite\u015fti \u2013 Sibiu. Dac\u0103 nu vor fi contesta\u0163ii, pe 23 martie 2019 vom putea semna contractul de proiectare \u015fi execu\u0163ie. De asemenea documenta\u0163ia referitoare la lotul 4 al aceleia\u015fi autostr\u0103zi Pite\u015fti &#8211; Sibiu, sec\u0163iunea Curtea de Arge\u015f \u2013 Tigveni, a fost transmis\u0103, spre validare, la ANAP. Astfel autostrada Pite\u015fti \u2013 Sibiu a intrat \u00een linie dreapt\u0103\u201d, a declarat R\u0103zvan Cuc, ministrul Transporturilor.<\/div>\n<div>\n&nbsp;<\/div>\n<div>\nCompania Na\u0163ional\u0103 de Administrare a Infrastructurii Rutiere (CNAIR) a finalizat, miercuri, procesul de evaluare a ofertelor depuse \u00een cadrul procedurii \u201eProiectare \u015fi execu\u0163ie autostrada Sibiu &#8211; Pite\u015fti, Sec\u0163iunea 1 Sibiu &#8211; Boi\u0163a, km. 0\u0102000 &#8211; km. 14\u0102150 &#8211; Lot 1 km. 0+000 \u2013 km. 13+170\u201d.<\/div>\n<div>\n&nbsp;<\/div>\n<div>\n<a href=\"https:\/\/www.zf.ro\/autostrazi\/una-dintre-cele-mai-asteptate-autostrazi-din-romania-intra-in-linie-dreapta-ministerul-transporturilor-a-desemnat-castigatorul-lotului-1-din-autostrada-pitesti-sibiu-17901138\">Cititi mai multe pe www.zf.ro<\/a><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Ministerul Transporturilor (MT) anun\u0163\u0103 c\u0103 a fost desemnat c\u00e2\u015ftig\u0103torul lotului 1 Boi\u0163a \u2013 Sibiu, parte integrant\u0103 a autostr\u0103zii Pite\u015fti \u2013 Sibiu, iar documenta\u0163ia aferent\u0103 lotului 4 Curtea de Arge\u015f \u2013 Tigveni a fost transmis\u0103 spre validare la Agen\u0163ia Na\u0163ional\u0103 pentru Achizi\u0163ii Publice &#8211; ANAP.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[510],"tags":[18255,7263,24548,293],"class_list":["post-171475","post","type-post","status-publish","format-standard","hentry","category-actualitate","tag-asteptare","tag-autostrazi","tag-dreapta","tag-intrare"],"_links":{"self":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/171475","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=171475"}],"version-history":[{"count":0,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/171475\/revisions"}],"wp:attachment":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=171475"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=171475"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=171475"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}