{"id":118200,"date":"2015-02-23T13:05:29","date_gmt":"2015-02-23T13:05:29","guid":{"rendered":"https:\/\/bm.dev.synology.me\/?p=118200"},"modified":"2015-02-23T13:05:29","modified_gmt":"2015-02-23T13:05:29","slug":"conferinta-zf-chiritoiu-romania-trebuie-sa-inchida-pana-in-2018-toti-producatorii-neprofitabili-de-energie","status":"publish","type":"post","link":"https:\/\/bm.dev.synology.me\/?p=118200","title":{"rendered":"CONFERIN\u0162A ZF &#8211; Chiri\u0163oiu: Rom\u00e2nia trebuie s\u0103 \u00eenchid\u0103 p\u00e2n\u0103 \u00een 2018 to\u0163i produc\u0103torii neprofitabili de energie"},"content":{"rendered":"<p>\n&#8220;Tot ce este neprofitabil trebuie s\u0103 \u00eenchidem p\u00e2n\u0103 \u00een 2018, anul limit\u0103 p\u00e2n\u0103 la care se pot acorda subven\u0163ii&#8221;, a declarat Chiri\u0163oiu la conferin\u0163a ZF Power Summit.<\/p>\n<p>\n<strong>El am men\u0163ionat pierderile de 1 miliard de euro \u00eenregistrate anul trecut de Complexul Energetic Hunedoara, care pot fi considerate ajutor de stat.<\/strong><\/p>\n<p>\n&#8220;Credibilitatea noastr\u0103 este destul de redus\u0103, trecutul nu ne avantajeaz\u0103 deloc. Trebuie s\u0103 convingem c\u0103 solu\u0163iile noastre au o logic\u0103 economic\u0103 \u015fi nu sunt un mod de a eluda regulile lor. (&#8230;) Nu va fi u\u015for s\u0103-i convingem c\u0103 avem nevoie de o capacitate care produce (electricitate &#8211; n.r.) la 300 \u015fi ceva de lei, c\u00e2nd pre\u0163ul energiei este de 100 \u015fi ceva de lei&#8221;, a ad\u0103ugat Chiri\u0163oiu.<\/p>\n<p>\nPrezent la ZF Power Summit, ministrul Energiei, Andrei Gerea, a declarat c\u0103 statul \u00eencearc\u0103 s\u0103 salveze de la faliment complexurile energetice Oltenia \u015fi Huneadoara, aflate \u00eentr-o situa\u0163ie dificil\u0103.<\/p>\n<p>\nPotrivit lui Gerea, de\u015fi este esen\u0163ial pentru securitatea sistemului energetic na\u0163ional, Complexul Energetic Hunedoara este necompetitiv \u015fi nu poate face fa\u0163\u0103 cerin\u0163elor economiei de pia\u0163\u0103.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rom\u00e2nia trebuie s\u0103 \u00eenchid\u0103 p\u00e2n\u0103 \u00een 2018 toate capacit\u0103\u0163ile energetice neprofitabile, iar autorit\u0103\u0163ilor rom\u00e2ne le va fi dificil s\u0103 conving\u0103 UE c\u0103 nu \u00eencearc\u0103 s\u0103 eludeze regulile, \u00eentruc\u00e2t au o credibilitate redus\u0103, potrivit pre\u015fedintelui Consiliului Concuren\u0163ei, Bogdan Chiri\u0163oiu.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[510],"tags":[6351,150],"class_list":["post-118200","post","type-post","status-publish","format-standard","hentry","category-actualitate","tag-concurenta","tag-energie"],"_links":{"self":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/118200","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=118200"}],"version-history":[{"count":0,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/118200\/revisions"}],"wp:attachment":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=118200"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=118200"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=118200"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}