{"id":106864,"date":"2014-05-07T18:00:39","date_gmt":"2014-05-07T18:00:39","guid":{"rendered":"https:\/\/bm.dev.synology.me\/?p=106864"},"modified":"2014-05-07T18:00:39","modified_gmt":"2014-05-07T18:00:39","slug":"cnadnr-a-pregatit-16-mil-euro-pentru-a-proteja-autostrazile-de-furturi-distrugeri-si-gunoaie","status":"publish","type":"post","link":"https:\/\/bm.dev.synology.me\/?p=106864","title":{"rendered":"CNADNR a preg\u0103tit 1,6 mil.euro pentru a proteja autostr\u0103zile de furturi, distrugeri \u015fi gunoaie"},"content":{"rendered":"<p>\n&nbsp;Serviciile ar urma s\u0103 fie asigurate de un num\u0103r de 40 de posturi, dintre care 22 pentru agen\u0163i de paz\u0103 \u015fi 18 pentru \u015foferi.<\/p>\n<p>\nTronsoanele de autostrad\u0103 vizate sunt Or\u0103\u015ftie &#8211; Sibiu lot 1 (22,2 km) \u015fi lot 2 (19,8 km), Lugoj &#8211; Deva lot 1 (27,7 km) \u015fi drum de leg\u0103tur\u0103 cu profil de autostrad\u0103 (10,5 km), Timi\u015foara &#8211; Lugoj lot 1 (9,5 km), Arad &#8211; Timi\u015foara (32,2 km), varianta de ocolire a municipiului Arad (10 km), Deva &#8211; Or\u0103\u015ftie (34,6 km), N\u0103dlac &#8211; Arad \u015fi drum de leg\u0103tur\u0103 lot 2 (16,6 km).<\/p>\n<p>\nPrimele dou\u0103 loturi ale Autostr\u0103zii Or\u0103\u015ftie &#8211; Sibiu, primul lot Lugoj &#8211; Deva \u015fi tronsonul 2 de la Deva &#8211; Or\u0103\u015ftie (Simeria &#8211; Or\u0103\u015ftie) au fost inaugurate anul trecut, primul lot Timi\u015foara &#8211; Lugoj \u015fi varianta de ocolire a municipiului Arad au fost deschise \u00een 2012, iar Arad &#8211; Timi\u015foara a fost finalizat\u0103 \u00een 2011.<\/p>\n<p>\n<a href=\"http:\/\/www.mediafax.ro\/economic\/cnadnr-a-pregatit-1-6-mil-euro-pentru-a-proteja-autostrazile-de-furturi-distrugeri-si-gunoaie-12606757\">Cititi mai multe pe<\/a> www.mediafax.ro<\/p>\n","protected":false},"excerpt":{"rendered":"<p>CNADNR vrea s\u0103 achizi\u0163ioneze servicii de paz\u0103 a patrimoniului pentru 183 de kilometri de autostrad\u0103, pe o perioad\u0103 de un an, valoarea cumulat\u0103 a celor \u015fase contracte scoase la licita\u0163ie fiind estimat\u0103 la 7,2 milioane lei (1,6 millioane euro), inclusiv TVA.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[510],"tags":[14911],"class_list":["post-106864","post","type-post","status-publish","format-standard","hentry","category-actualitate","tag-cnadnr"],"_links":{"self":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/106864","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=106864"}],"version-history":[{"count":0,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=\/wp\/v2\/posts\/106864\/revisions"}],"wp:attachment":[{"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=106864"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=106864"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bm.dev.synology.me\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=106864"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}